IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
SIC 353 Construction And Related Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0080 # 07 Y:2004 07 2004 USE OPTIMUM TEMPERATURE $62,610 $35,948 Implemented
IC0080 # 06 Y:2004 06 2004 USE OPTIMUM TEMPERATURE $24,757 $53,496 Not Implemented
UM0247 # 06 Y:2004 06 2004 INSTALL COMMON HEADER ON COMPRESSORS $1,888 $1,100 Implemented
UM0247 # 01 Y:2004 01 2004 USE RADIANT HEATER FOR SPOT HEATING $300,078 $269,346 Not Implemented
UM0247 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,882 $7,500 Implemented
UM0247 # 03 Y:2004 03 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,365 $6,000 Not Implemented
UM0247 # 04 Y:2004 04 2004 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $10,227 $11,000 Not Implemented
UM0247 # 05 Y:2004 05 2004 UPGRADE CONTROLS ON COMPRESSORS $6,051 $12,000 Not Implemented
UM0216 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,873 $1,125 Not Implemented
UM0216 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $1,100 $500 Not Implemented
UM0216 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,056 $500 Not Implemented
UM0216 # 04 Y:2002 04 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,000 $2,000 Not Implemented
UM0216 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $222 $620 Not Implemented
UM0216 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,496 $7,269 Not Implemented
ND0360 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $886 $3,912 Not Implemented
ND0360 # 02 Y:2000 02 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,495 $0 Not Implemented
ND0360 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $611 $730 Not Implemented
ND0360 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,809 $80 Not Implemented
ND0360 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,566 $560 Implemented
ND0360 # 06 Y:2000 06 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $337 $300 Not Implemented
ND0360 # 07 Y:2000 07 2000 USE OPTIMUM TEMPERATURE $86 $20 Implemented
UM0110 # 06 Y:1998 06 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $1,394 $624 Implemented
UM0110 # 05 Y:1998 05 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $3,480 $1,000 Implemented
UM0110 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $301 $800 Not Implemented
UM0110 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $900 $50 n/a