IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

71

matching recommendations
Reset
SIC 353 Construction And Related Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0641 # 05 Y:2023 05 2023 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $32,260 $112,625 Not Implemented
NC0542 # 13 Y:2015 13 2015 INSTALL OCCUPANCY SENSORS $1,213 $500 Implemented
NC0542 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,174 $20,250 Implemented
NC0542 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,264 $200 Implemented
NC0542 # 03 Y:2015 03 2015 RECOVER WASTE HEAT FROM EQUIPMENT $4,263 $3,000 Implemented
NC0542 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $209 $230 Implemented
NC0542 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,525 $3,000 Implemented
NC0542 # 06 Y:2015 06 2015 ISOLATE HOT OR COLD EQUIPMENT $5,296 $420 Implemented
NC0542 # 07 Y:2015 07 2015 REDESIGN PROCESS $2,648 $500 Not Implemented
NC0542 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,576 $510 Implemented
NC0542 # 09 Y:2015 09 2015 DEVELOP A REPAIR/REPLACE POLICY $3,364 $5,865 Implemented
NC0542 # 10 Y:2015 10 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $741 $140 Implemented
NC0542 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $580 $144 Implemented
NC0542 # 12 Y:2015 12 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,925 $8,373 Implemented
OD0087 # 06 Y:1997 06 1997 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $9,461 $12,800 n/a
OD0087 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $542 $1,018 n/a
OD0087 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $682 $161 n/a
OD0087 # 03 Y:1997 03 1997 UPGRADE CONTROLS ON COMPRESSORS $783 $560 n/a
OD0087 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,205 $1,189 n/a
OD0087 # 05 Y:1997 05 1997 BURN WASTE OIL FOR HEAT $1,885 $3,091 n/a
OD0056 # 01 Y:1996 01 1996 RECOVER WASTE HEAT FROM EQUIPMENT $4,344 $701 n/a
OD0056 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $154 $1,365 n/a
OD0056 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $269 $520 n/a
OD0056 # 04 Y:1996 04 1996 INSTALL TIMERS AND/OR THERMOSTATS $1,815 $1,365 n/a
OD0056 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $580 $320 n/a