IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,768

matching recommendations
Reset
SIC 353 Construction And Related Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0075 # 03 Y:2011 03 2011 RECOVER WASTE HEAT FROM EQUIPMENT $47,625 $21,000 Implemented
TT0075 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,202 $14,000 Implemented
TT0075 # 05 Y:2011 05 2011 INSTALL COMMON HEADER ON COMPRESSORS $44,869 $32,200 Implemented
TT0075 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,146 $5,000 Implemented
TT0075 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,771 $1,152 Implemented
TT0075 # 08 Y:2011 08 2011 ISOLATE HOT OR COLD EQUIPMENT $1,379 $2,500 Implemented
TT0075 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,369 $5,436 Not Implemented
TT0070 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,235 $0 Not Implemented
TT0070 # 02 Y:2011 02 2011 INSULATE BARE EQUIPMENT $7,025 $2,100 Not Implemented
TT0070 # 03 Y:2011 03 2011 UPGRADE CONTROLS ON COMPRESSORS $1,990 $1,600 Not Implemented
TT0070 # 04 Y:2011 04 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $875 $1,200 Not Implemented
TT0070 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,337 $21,600 Not Implemented
TT0070 # 06 Y:2011 06 2011 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,730 $4,900 Not Implemented
TT0070 # 07 Y:2011 07 2011 OPTIMIZE PLANT POWER FACTOR $6,582 $32,600 Not Implemented
TT0070 # 08 Y:2011 08 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $11,486 $102,000 Not Implemented
TT0070 # 09 Y:2011 09 2011 DEVELOP A REPAIR/REPLACE POLICY $5,985 $1,347 Not Implemented
BD0388 # 01 Y:2011 01 2011 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $12,465 $60,000 Not Implemented
BD0388 # 02 Y:2011 02 2011 USE RADIANT HEATER FOR SPOT HEATING $30,750 $20,000 Not Implemented
BD0388 # 03 Y:2011 03 2011 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,470 $4,000 Not Implemented
BD0388 # 04 Y:2011 04 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,581 $1,200 Not Implemented
BD0388 # 05 Y:2011 05 2011 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $63,847 $26,000 Not Implemented
LL0345 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $172,828 $126,720 Implemented
LL0345 # 02 Y:2011 02 2011 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $44,703 $4,660 Implemented
LL0345 # 03 Y:2011 03 2011 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $14,141 $1,530 Not Implemented
LL0345 # 04 Y:2011 04 2011 USE PHOTOCELL CONTROLS $6,770 $330 Not Implemented