IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

96

matching recommendations
Reset
SIC 353 Construction And Related Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0379 # 09 Y:2008 09 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,760 $0 Implemented
WV0379 # 10 Y:2008 10 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,723 $1,000 Implemented
WV0379 # 11 Y:2008 11 2008 DEVELOP A REPAIR/REPLACE POLICY $2,610 $763 Implemented
WV0379 # 12 Y:2008 12 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,133 $160 Implemented
WV0379 # 13 Y:2008 13 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,578 $4,167 Implemented
LE0118 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,581 $2,500 Not Implemented
LE0118 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,252 $0 Not Implemented
LE0118 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $769 $135 Implemented
LE0118 # 04 Y:2001 04 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $480 $0 Implemented
LE0118 # 05 Y:2001 05 2001 ISOLATE HOT OR COLD EQUIPMENT $339 $1,615 Not Implemented
RU0123 # 04 Y:1991 04 1991 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,390 $5,320 Implemented
RU0123 # 03 Y:1991 03 1991 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $7,866 $46,704 Implemented
RU0123 # 02 Y:1991 02 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,413 $272 Implemented
RU0123 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,611 $0 Implemented
ST0016 # 03 Y:1985 03 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $939 $700 Implemented
ST0016 # 02 Y:1985 02 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,120 $0 Not Implemented
ST0016 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,538 $136 Implemented
ST0016 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,817 $1,597 Implemented
ST0016 # 05 Y:1985 05 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $752 $5,600 Not Implemented
ST0016 # 06 Y:1985 06 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,005 $0 Implemented
ST0016 # 07 Y:1985 07 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,643 $378 Implemented