IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
Reset
SIC 353 Construction And Related Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0070 # 07 Y:2011 07 2011 OPTIMIZE PLANT POWER FACTOR $6,582 $32,600 Not Implemented
TT0070 # 02 Y:2011 02 2011 INSULATE BARE EQUIPMENT $7,025 $2,100 Not Implemented
TT0070 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,235 $0 Not Implemented
TT0070 # 06 Y:2011 06 2011 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,730 $4,900 Not Implemented
TT0070 # 08 Y:2011 08 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $11,486 $102,000 Not Implemented
TT0070 # 03 Y:2011 03 2011 UPGRADE CONTROLS ON COMPRESSORS $1,990 $1,600 Not Implemented
TT0070 # 04 Y:2011 04 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $875 $1,200 Not Implemented
TT0070 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,337 $21,600 Not Implemented
TT0070 # 09 Y:2011 09 2011 DEVELOP A REPAIR/REPLACE POLICY $5,985 $1,347 Not Implemented
AR0140 # 04 Y:1998 04 1998 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $3,592 $3,260 n/a
AR0140 # 10 Y:1998 10 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $66,000 $1,280 n/a
AR0140 # 09 Y:1998 09 1998 MOVE PRODUCT USING MECHANICAL MEANS $66,072 $3,200 n/a
AR0140 # 08 Y:1998 08 1998 REDUCE SCRAP PRODUCTION $14,997 $18,800 n/a
AR0140 # 07 Y:1998 07 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $46,527 $1,000 n/a
AR0140 # 06 Y:1998 06 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $13,190 $8,000 n/a
AR0140 # 05 Y:1998 05 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $499 $279 n/a
AR0140 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,420 $130 n/a
AR0140 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,967 $250 n/a
AR0140 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $33,786 $22,860 n/a
AR0102 # 02 Y:1996 02 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,248 $6,802 Implemented
AR0102 # 07 Y:1996 07 1996 RECYCLE CLEANING SOLVENT AND REUSE $12,981 $6,000 Implemented
AR0102 # 06 Y:1996 06 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,760 $6,000 Not Implemented
AR0102 # 05 Y:1996 05 1996 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $234 $30 Implemented
AR0102 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $147 $60 Implemented
AR0102 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,611 $390 Not Implemented