IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 353 Construction And Related Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0982 # 03 Y:2024 03 2024 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $194 $135 n/a
GT0982 # 02 Y:2024 02 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,144 $1,200 n/a
GT0982 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,510 $1,850 n/a
GT0982 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,571 $1,100 n/a
GT0982 # 05 Y:2024 05 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $923 $800 n/a
GT0982 # 07 Y:2024 07 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $67,468 $877,960 n/a
GT0982 # 06 Y:2024 06 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,851 $12,950 n/a
UF0394 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,450 $2,219 Not Implemented
UF0394 # 10 Y:2006 10 2006 INSTALL BACK-UP EQUIPMENT $341,046 $100,000 Not Implemented
UF0394 # 09 Y:2006 09 2006 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $22,183 $24,800 Not Implemented
UF0394 # 07 Y:2006 07 2006 LOWER CEILING TO REDUCE CONDITIONED SPACE $12,995 $1,250 Not Implemented
UF0394 # 06 Y:2006 06 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,473 $24,457 Not Implemented
UF0394 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,956 $0 Implemented
UF0394 # 04 Y:2006 04 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,147 $33,136 Not Implemented
UF0394 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,287 $810 Implemented
UF0394 # 02 Y:2006 02 2006 OPTIMIZE PLANT POWER FACTOR $145,983 $20,000 Not Implemented
UF0394 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $1,756 $1,706 Implemented
GT0454 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61 $8,000 Implemented
GT0454 # 06 Y:1991 06 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,240 $9,000 Implemented
GT0454 # 05 Y:1991 05 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,968 $1,500 Implemented
GT0454 # 04 Y:1991 04 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $104 $0 Implemented
GT0454 # 03 Y:1991 03 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $130 $5,350 Implemented
GT0454 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $489 $11,450 Implemented
GT0152 # 02 Y:1982 02 1982 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $569 $500 Not Implemented
GT0152 # 03 Y:1982 03 1982 INSTALL TIMERS AND/OR THERMOSTATS $11,235 $2,600 Not Implemented