IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 353 Construction And Related Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0754 # 03 Y:2022 03 2022 FILTER AND REUSE HYDRAULIC OIL $13,859 $65,000 Not Implemented
OR0754 # 02 Y:2022 02 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,033 $3,560 Implemented
OR0754 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,871 $2,675 Implemented
OR0748 # 05 Y:2022 05 2022 INSULATE BARE EQUIPMENT $2,032 $9,520 Implemented
OR0748 # 04 Y:2022 04 2022 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $99,431 $292,453 Implemented
OR0748 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $3,913 $10,533 Implemented
OR0748 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,763 $1,880 Implemented
OR0748 # 02 Y:2022 02 2022 FILTER AND REUSE HYDRAULIC OIL $34,830 $88,699 Implemented
OR0700 # 01 Y:2018 01 2018 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $7,430 $1,495 Not Implemented
OR0700 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,059 $6,826 Not Implemented
OR0700 # 03 Y:2018 03 2018 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE $2,175 $5,389 Not Implemented
OR0608 # 04 Y:2013 04 2013 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $11,970 $41,000 Not Implemented
OR0608 # 07 Y:2013 07 2013 USE PHOTOCELL CONTROLS $658 $966 Not Implemented
OR0608 # 03 Y:2013 03 2013 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $125,546 $300,000 Not Implemented
OR0608 # 02 Y:2013 02 2013 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $107,138 $55,641 Implemented
OR0608 # 01 Y:2013 01 2013 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $32,340 $0 Implemented
OR0608 # 05 Y:2013 05 2013 INSULATE BARE EQUIPMENT $518 $135 Not Implemented
OR0608 # 06 Y:2013 06 2013 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $2,698 $1,220 Not Implemented
OR0065 # 06 Y:1989 06 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,845 $2,000 Implemented
OR0065 # 05 Y:1989 05 1989 OPTIMIZE PLANT POWER FACTOR $5,181 $5,400 Not Implemented
OR0065 # 04 Y:1989 04 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $394 $279 Implemented
OR0065 # 03 Y:1989 03 1989 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $338 $150 Implemented
OR0065 # 02 Y:1989 02 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,603 $1,075 Not Implemented
OR0065 # 01 Y:1989 01 1989 RECOVER WASTE HEAT FROM EQUIPMENT $5,924 $2,050 Implemented
OR0022 # 01 Y:1988 01 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $909 $304 Not Implemented