IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

99

matching recommendations
Reset
SIC 353 Construction And Related Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0649 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $104 $37 Implemented
OK0649 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $16,238 $35,000 Not Implemented
OK0649 # 05 Y:2002 05 2002 $397,966 $600,000 Not Implemented
OK0649 # 04 Y:2002 04 2002 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,706 $2,520 Not Implemented
OK0649 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,956 $3,504 Implemented
MS0214 # 07 Y:2002 07 2002 INSTALL TIMERS AND/OR THERMOSTATS $1,517 $1,416 Not Implemented
MS0214 # 05 Y:2002 05 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $2,288 $270 Implemented
MS0214 # 06 Y:2002 06 2002 DISCONNECT BALLASTS $1,230 $1,395 Implemented
MS0214 # 11 Y:2002 11 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $38,952 $153,600 Not Implemented
MS0214 # 09 Y:2002 09 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $557 $200 Implemented
MS0214 # 10 Y:2002 10 2002 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING $6,462 $6,610 Not Implemented
MS0214 # 01 Y:2002 01 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $26,748 $7,400 Implemented
MS0214 # 08 Y:2002 08 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $582 $0 Implemented
MS0214 # 04 Y:2002 04 2002 INSTALL TIMERS AND/OR THERMOSTATS $3,765 $3,400 Not Implemented
MS0214 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,766 $288 Implemented
MS0214 # 02 Y:2002 02 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,371 $11,500 Implemented
CO0509 # 01 Y:2002 01 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,920 $8,000 Not Implemented
CO0509 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $640 $2,260 Not Implemented
CO0509 # 07 Y:2002 07 2002 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $2,450 $1,330 Implemented
CO0509 # 05 Y:2002 05 2002 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $17,700 $2,000 Implemented
CO0509 # 06 Y:2002 06 2002 INCREASE USE OF AUTOMATION $9,140 $1,600 Implemented
CO0509 # 04 Y:2002 04 2002 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $610 $1,920 Not Implemented
CO0509 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,620 $230 Implemented
LL0149 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,591 $210 Not Implemented
LL0149 # 01 Y:2002 01 2002 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $1,932 $1,499 Implemented