IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 3531 Construction Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0998 # 12 Y:2019 12 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,003 $0 Implemented
OK0998 # 08 Y:2019 08 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,330 $1,074 Implemented
OK0998 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,784 $2,853 Implemented
OK0998 # 04 Y:2019 04 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,603 $400 Implemented
KU0497 # 09 Y:1998 09 1998 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $46,350 $3,940 Implemented
KU0497 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $480 $450 Implemented
KU0497 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $840 $1,050 Implemented
KU0497 # 03 Y:1998 03 1998 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,080 $0 Implemented
KU0497 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,050 $7,880 Implemented
KU0365 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,302 $540 Implemented
KU0365 # 07 Y:1992 07 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $397 $250 Implemented
KU0365 # 03 Y:1992 03 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,768 $887 Implemented
KU0365 # 02 Y:1992 02 1992 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $6,266 $31,766 Implemented
KU0167 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $149 $0 Implemented
KU0167 # 03 Y:1985 03 1985 INSTALL AUTOMATIC STACK DAMPER $1,057 $800 Implemented
KU0167 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,664 $3,439 Implemented
KU0167 # 01 Y:1985 01 1985 INSTALL TIMERS AND/OR THERMOSTATS $10,250 $80 Implemented
KU0112 # 01 Y:1984 01 1984 INSTALL TIMERS AND/OR THERMOSTATS $18,588 $1,074 Implemented
KU0112 # 08 Y:1984 08 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $286 $0 Implemented
KU0112 # 06 Y:1984 06 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,012 $2,800 Implemented
KU0112 # 05 Y:1984 05 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $398 $400 Implemented
KU0112 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $795 $200 Implemented