IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
SIC 3531 Construction Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0497 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $480 $450 Implemented
KU0497 # 01 Y:1998 01 1998 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE $5,550 $12,730 Not Implemented
KU0497 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,050 $7,880 Implemented
KU0497 # 03 Y:1998 03 1998 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,080 $0 Implemented
KU0497 # 09 Y:1998 09 1998 $46,350 $3,940 Implemented
KU0497 # 08 Y:1998 08 1998 PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS $1,220 $260 Not Implemented
KU0497 # 07 Y:1998 07 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,300 $8,000 Not Implemented
KU0497 # 06 Y:1998 06 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $78,000 $8,990 Not Implemented
KU0497 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $840 $1,050 Implemented
KU0365 # 01 Y:1992 01 1992 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $13,442 $0 Not Implemented
KU0365 # 02 Y:1992 02 1992 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $6,266 $31,766 Implemented
KU0365 # 03 Y:1992 03 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,768 $887 Implemented
KU0365 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $873 $870 Not Implemented
KU0365 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,302 $540 Implemented
KU0365 # 06 Y:1992 06 1992 RECOVER WASTE HEAT FROM EQUIPMENT $400 $900 Not Implemented
KU0365 # 08 Y:1992 08 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $254 $160 Not Implemented
KU0365 # 07 Y:1992 07 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $397 $250 Implemented
OK0361 # 01 Y:1991 01 1991 RECOVER WASTE HEAT FROM EQUIPMENT $307 $403 Not Implemented
OK0361 # 07 Y:1991 07 1991 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,356 $4,600 Not Implemented
OK0361 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $756 $0 Not Implemented
OK0361 # 05 Y:1991 05 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,198 $107 Not Implemented
OK0361 # 04 Y:1991 04 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,521 $13,526 Not Implemented
OK0361 # 03 Y:1991 03 1991 INSTALL TIMERS AND/OR THERMOSTATS $3,012 $1,050 Not Implemented
OK0361 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,285 $0 Not Implemented
KU0167 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $149 $0 Implemented