IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

829

matching recommendations
Reset
SIC 3531 Construction Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0582 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,983 $200 Implemented
NC0582 # 07 Y:2017 07 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,603 $500 Implemented
NC0582 # 08 Y:2017 08 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,895 $100 Not Implemented
NC0582 # 09 Y:2017 09 2017 RECOVER WASTE HEAT FROM EQUIPMENT $7,470 $4,500 Not Implemented
NC0582 # 10 Y:2017 10 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,578 $500 Implemented
NC0582 # 11 Y:2017 11 2017 DEVELOP A REPAIR/REPLACE POLICY $1,782 $5,865 Implemented
NC0582 # 12 Y:2017 12 2017 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $7,886 $4,100 Not Implemented
WV0533 # 01 Y:2016 01 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $82,641 $202,000 Not Implemented
WV0533 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,898 $72,687 Implemented
WV0533 # 03 Y:2016 03 2016 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $15,212 $35,900 Implemented
WV0533 # 04 Y:2016 04 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,228 $2,417 Implemented
WV0533 # 05 Y:2016 05 2016 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $9,595 $1,000 Implemented
WV0533 # 06 Y:2016 06 2016 UPGRADE CONTROLS ON COMPRESSORS $8,986 $20,750 Not Implemented
WV0533 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $8,138 $4,160 Not Implemented
WV0533 # 08 Y:2016 08 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,301 $4,100 Not Implemented
WV0533 # 09 Y:2016 09 2016 ISOLATE HOT OR COLD EQUIPMENT $4,874 $5,100 Not Implemented
WV0533 # 10 Y:2016 10 2016 DEVELOP A REPAIR/REPLACE POLICY $3,084 $665 Implemented
WV0533 # 11 Y:2016 11 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,697 $300 Implemented
WV0533 # 12 Y:2016 12 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,004 $2,230 Implemented
WV0533 # 13 Y:2016 13 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $770 $2,150 Implemented
WV0533 # 14 Y:2016 14 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $558 $0 Implemented
WV0533 # 15 Y:2016 15 2016 INSULATE BARE EQUIPMENT $218 $470 Implemented
AM0696 # 01 Y:2015 01 2015 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $16,880 $30,000 Not Implemented
AM0696 # 02 Y:2015 02 2015 MODIFY WORKLOAD $8,280 $0 Not Implemented
AM0696 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,810 $28,220 Implemented