Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
35
matching recommendationsSIC | 3531 | Construction Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0735 # 02 Y:2017 | 02 | 2017 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $8,320 | $4,120 | Not Implemented |
AM0735 # 03 Y:2017 | 03 | 2017 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,770 | $320 | Implemented |
AM0735 # 04 Y:2017 | 04 | 2017 | INSTALL OCCUPANCY SENSORS | $920 | $1,700 | Not Implemented |
AM0735 # 05 Y:2017 | 05 | 2017 | REUSE RAGS UNTIL COMPLETELY SOILED | $880 | $0 | Implemented |
AM0735 # 06 Y:2017 | 06 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,160 | $500 | Implemented |
AM0735 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,105 | $410 | Implemented |
AM0735 # 08 Y:2017 | 08 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $195 | $15 | Not Implemented |
AM0735 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,250 | $52,360 | Implemented |
WV0542 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,056 | $765 | Implemented |
WV0542 # 15 Y:2017 | 15 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $48 | $105 | Not Implemented |
WV0542 # 04 Y:2017 | 04 | 2017 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $4,841 | $16,500 | Not Implemented |
WV0542 # 05 Y:2017 | 05 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,681 | $2,700 | Implemented |
WV0542 # 06 Y:2017 | 06 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,665 | $0 | Implemented |
WV0542 # 07 Y:2017 | 07 | 2017 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $3,828 | $1,800 | Not Implemented |
WV0542 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,984 | $9,625 | Implemented |
WV0542 # 09 Y:2017 | 09 | 2017 | MINIMIZE WATER USAGE | $2,251 | $7,000 | Implemented |
WV0542 # 10 Y:2017 | 10 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,131 | $883 | Implemented |
WV0542 # 11 Y:2017 | 11 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $963 | $940 | Implemented |
WV0542 # 12 Y:2017 | 12 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $955 | $2,135 | Implemented |
WV0542 # 13 Y:2017 | 13 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $926 | $100 | Implemented |
WV0542 # 14 Y:2017 | 14 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $881 | $2,150 | Not Implemented |
WV0542 # 02 Y:2017 | 02 | 2017 | INSTALL OCCUPANCY SENSORS | $5,206 | $5,330 | Implemented |
WV0542 # 01 Y:2017 | 01 | 2017 | USE EVAPORATION TO CONCENTRATE MATERIAL | $9,150 | $45,000 | Not Implemented |
NC0582 # 12 Y:2017 | 12 | 2017 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $7,886 | $4,100 | Not Implemented |
NC0582 # 11 Y:2017 | 11 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $1,782 | $5,865 | Implemented |