IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

295

matching recommendations
Reset
SIC 3532 Mining Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0006 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,942 $0 Not Implemented
NT0006 # 06 Y:2023 06 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $151,941 $2,205,000 Not Implemented
NT0006 # 05 Y:2023 05 2023 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $16,552 $0 Not Implemented
NT0006 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,685 $0 Not Implemented
NT0006 # 01 Y:2023 01 2023 UPGRADE CONTROLS ON COMPRESSORS $34,941 $10,056 Not Implemented
NT0006 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $12,361 $27,064 Not Implemented
NL0077 # 05 Y:2023 05 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,997 $470 Not Implemented
NL0077 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,279 $4,500 Implemented
NL0077 # 06 Y:2023 06 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $527 $200 Implemented
NL0077 # 02 Y:2023 02 2023 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $121,895 $4,200 Implemented
NL0077 # 01 Y:2023 01 2023 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $150,762 $690,000 Not Implemented
NL0077 # 03 Y:2023 03 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $36,689 $350 Not Implemented
WV0608 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,836 $1,100 Implemented
WV0608 # 05 Y:2021 05 2021 DEVELOP A REPAIR/REPLACE POLICY $746 $300 Implemented
WV0608 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,495 $38,306 Not Implemented
WV0608 # 01 Y:2021 01 2021 UPGRADE CONTROLS ON COMPRESSORS $32,464 $14,300 Not Implemented
WV0608 # 04 Y:2021 04 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $952 $0 Implemented
WM0155 # 04 Y:2020 04 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,791 $15,060 Not Implemented
WM0155 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,679 $1,750 Not Implemented
WM0155 # 07 Y:2020 07 2020 USE PHOTOCELL CONTROLS $541 $1,075 Not Implemented
WM0155 # 08 Y:2020 08 2020 INSTALL OCCUPANCY SENSORS $451 $750 Not Implemented
WM0155 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,927 $8,716 Not Implemented
WM0155 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,761 $3,855 Not Implemented
WM0155 # 03 Y:2020 03 2020 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,335 $1,700 Not Implemented
WM0155 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $26,709 $110,788 Not Implemented