IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

152

matching recommendations
Reset
SIC 3532 Mining Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0542 # 09 Y:2015 09 2015 DEVELOP A REPAIR/REPLACE POLICY $3,364 $5,865 Implemented
NC0542 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,576 $510 Implemented
NC0542 # 06 Y:2015 06 2015 ISOLATE HOT OR COLD EQUIPMENT $5,296 $420 Implemented
NC0542 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,525 $3,000 Implemented
NC0542 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $209 $230 Implemented
NC0542 # 03 Y:2015 03 2015 RECOVER WASTE HEAT FROM EQUIPMENT $4,263 $3,000 Implemented
NC0542 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,264 $200 Implemented
NC0542 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,174 $20,250 Implemented
NC0542 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $580 $144 Implemented
NC0542 # 12 Y:2015 12 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,925 $8,373 Implemented
NC0542 # 13 Y:2015 13 2015 INSTALL OCCUPANCY SENSORS $1,213 $500 Implemented
BD0455 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,997 $40,950 Implemented
BD0455 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $839 $725 Implemented
BD0455 # 09 Y:2015 09 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,388 $25 Implemented
BD0455 # 08 Y:2015 08 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,994 $900 Implemented
BD0455 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $6,580 $2,250 Implemented
BD0455 # 05 Y:2015 05 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $7,295 $25 Implemented
BD0455 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,322 $13,700 Implemented
OR0608 # 01 Y:2013 01 2013 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $32,340 $0 Implemented
OR0608 # 02 Y:2013 02 2013 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $107,138 $55,641 Implemented
WV0379 # 06 Y:2008 06 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,977 $700 Implemented
WV0379 # 09 Y:2008 09 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,760 $0 Implemented
WV0379 # 10 Y:2008 10 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,723 $1,000 Implemented
WV0379 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,550 $0 Implemented
WV0379 # 05 Y:2008 05 2008 RECOVER WASTE HEAT FROM EQUIPMENT $10,262 $1,080 Implemented