IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

714

matching recommendations
Reset
SIC 3533 Oil And Gas Field Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0759 # 04 Y:2018 04 2018 PAY UTILITY BILLS ON TIME $2,702 $100 Implemented
AM0759 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,305 $100 Implemented
AM0759 # 02 Y:2018 02 2018 OPTIMIZE PLANT POWER FACTOR $5,714 $12,461 Not Implemented
AM0759 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,939 $12,678 Not Implemented
OK0966 # 01 Y:2017 01 2017 REPLACE BOILER $125,000 $442,000 Not Implemented
OK0966 # 02 Y:2017 02 2017 BASE UTILITY CHARGES ON USAGE RATHER THAN AREA OCCUPIED $113,700 $24,000 Implemented
OK0966 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $74,450 $305,694 Implemented
OK0966 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,526 $21,137 Implemented
OK0966 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $7,886 $0 Not Implemented
OK0966 # 06 Y:2017 06 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,570 $17,250 Implemented
OK0966 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,676 $17,550 Implemented
OK0966 # 08 Y:2017 08 2017 COVER OPEN TANKS $2,956 $1,250 Not Implemented
OK0966 # 09 Y:2017 09 2017 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $36 $100 Implemented
BD0470 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $185 $200 Not Implemented
BD0470 # 10 Y:2015 10 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $305 $450 Not Implemented
BD0470 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $911 $1,575 Not Implemented
BD0470 # 08 Y:2015 08 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $997 $450 Not Implemented
BD0470 # 07 Y:2015 07 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,041 $20 Not Implemented
BD0470 # 06 Y:2015 06 2015 USE PHOTOCELL CONTROLS $1,063 $950 Not Implemented
BD0470 # 05 Y:2015 05 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,984 $2,500 Not Implemented
BD0470 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,232 $500 Not Implemented
BD0470 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,298 $5,241 Not Implemented
BD0470 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,593 $7,220 Not Implemented
BD0470 # 01 Y:2015 01 2015 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $26,090 $30,000 Not Implemented
OK0905 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,534 $2,400 Not Implemented