Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsSIC | 3533 | Oil And Gas Field Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0601 # 07 Y:2000 | 07 | 2000 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $5,829 | $0 | Not Implemented |
OK0601 # 06 Y:2000 | 06 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $14,040 | $35,000 | Implemented |
OK0601 # 05 Y:2000 | 05 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $29,952 | $0 | Not Implemented |
OK0601 # 04 Y:2000 | 04 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $140,000 | $100,000 | Not Implemented |
OK0601 # 03 Y:2000 | 03 | 2000 | USE PHOTOCELL CONTROLS | $17,881 | $5,000 | Implemented |
OK0601 # 02 Y:2000 | 02 | 2000 | INSTALL COMMON HEADER ON COMPRESSORS | $11,372 | $3,000 | Not Implemented |
OK0601 # 01 Y:2000 | 01 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $684 | $3,500 | Implemented |
AM0377 # 04 Y:2000 | 04 | 2000 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $900 | $1,000 | Not Implemented |
AM0377 # 07 Y:2000 | 07 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $230 | $0 | Implemented |
AM0377 # 06 Y:2000 | 06 | 2000 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $320 | $0 | Implemented |
AM0377 # 05 Y:2000 | 05 | 2000 | INSTALL OCCUPANCY SENSORS | $450 | $110 | Implemented |
AM0377 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,870 | $500 | Implemented |
AM0377 # 02 Y:2000 | 02 | 2000 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $11,500 | $6,100 | Implemented |
AM0377 # 01 Y:2000 | 01 | 2000 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $27,190 | $0 | Implemented |
AM0376 # 01 Y:2000 | 01 | 2000 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $77,809 | $157,500 | Not Implemented |
AM0376 # 08 Y:2000 | 08 | 2000 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $600 | $1,030 | Implemented |
AM0376 # 07 Y:2000 | 07 | 2000 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $700 | $350 | Implemented |
AM0376 # 06 Y:2000 | 06 | 2000 | USE PHOTOCELL CONTROLS | $730 | $605 | Implemented |
AM0376 # 05 Y:2000 | 05 | 2000 | ADD AREA LIGHTING SWITCHES | $950 | $640 | Implemented |
AM0376 # 04 Y:2000 | 04 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,250 | $0 | Not Implemented |
AM0376 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,410 | $3,340 | Implemented |
AM0376 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,313 | $32,300 | Not Implemented |