IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

150

matching recommendations
Reset
SIC 3534 Elevators And Moving Stairways
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0457 # 03 Y:2012 03 2012 LOWER CEILING TO REDUCE CONDITIONED SPACE $19,472 $40,000 Not Implemented
NC0457 # 06 Y:2012 06 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $2,161 $2,000 Not Implemented
TT0075 # 02 Y:2011 02 2011 RECOVER WASTE HEAT FROM EQUIPMENT $109,802 $50,000 Not Implemented
TT0075 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,202 $14,000 Implemented
TT0075 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,369 $5,436 Not Implemented
TT0075 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,771 $1,152 Implemented
TT0075 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,146 $5,000 Implemented
TT0075 # 05 Y:2011 05 2011 INSTALL COMMON HEADER ON COMPRESSORS $44,869 $32,200 Implemented
TT0075 # 03 Y:2011 03 2011 RECOVER WASTE HEAT FROM EQUIPMENT $47,625 $21,000 Implemented
TT0075 # 01 Y:2011 01 2011 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $36,083 $42,000 Not Implemented
TT0075 # 08 Y:2011 08 2011 ISOLATE HOT OR COLD EQUIPMENT $1,379 $2,500 Implemented
BD0382 # 03 Y:2010 03 2010 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,368 $2,000 Implemented
BD0382 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,174 $20,735 Implemented
BD0382 # 02 Y:2010 02 2010 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $3,316 $3,200 n/a
BD0382 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $323 $442 Implemented
BD0382 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $244 $300 Implemented
BD0382 # 06 Y:2010 06 2010 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,020 $360 n/a
BD0382 # 07 Y:2010 07 2010 $1,160 $160 Implemented
LE0278 # 13 Y:2008 13 2008 INSTALL TIMERS AND/OR THERMOSTATS $1,785 $450 Implemented
LE0278 # 03 Y:2008 03 2008 USE RADIANT HEATER FOR SPOT HEATING $17,728 $16,000 Not Implemented
LE0278 # 11 Y:2008 11 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,195 $1,824 Implemented
LE0278 # 07 Y:2008 07 2008 RECOVER WASTE HEAT FROM EQUIPMENT $6,783 $7,000 Not Implemented
LE0278 # 06 Y:2008 06 2008 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $8,828 $7,000 Implemented
LE0278 # 05 Y:2008 05 2008 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $10,716 $1,200 Not Implemented
LE0278 # 04 Y:2008 04 2008 INSTALL TIMERS AND/OR THERMOSTATS $12,408 $9,600 Not Implemented