Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
150
matching recommendationsSIC | 3534 | Elevators And Moving Stairways |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0278 # 08 Y:2008 | 08 | 2008 | USE OPTIMUM TEMPERATURE | $7,669 | $500 | Not Implemented |
LE0278 # 09 Y:2008 | 09 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,894 | $304 | Not Implemented |
LE0278 # 10 Y:2008 | 10 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,764 | $800 | Not Implemented |
LE0278 # 11 Y:2008 | 11 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,195 | $1,824 | Implemented |
LE0278 # 12 Y:2008 | 12 | 2008 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,387 | $3,290 | Not Implemented |
LE0278 # 13 Y:2008 | 13 | 2008 | INSTALL TIMERS AND/OR THERMOSTATS | $1,785 | $450 | Implemented |
LE0278 # 14 Y:2008 | 14 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $52,373 | $142,010 | Implemented |
UD0724 # 01 Y:2005 | 01 | 2005 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $59,198 | $30,000 | Not Implemented |
UD0724 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,240 | $102,000 | Not Implemented |
UD0724 # 03 Y:2005 | 03 | 2005 | USE PHOTOCELL CONTROLS | $16,400 | $0 | Implemented |
UD0724 # 04 Y:2005 | 04 | 2005 | INSULATE BARE EQUIPMENT | $13,563 | $6,505 | Implemented |
UD0724 # 05 Y:2005 | 05 | 2005 | SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS | $9,550 | $530 | Not Implemented |
UD0724 # 06 Y:2005 | 06 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,922 | $4,800 | Not Implemented |
UD0724 # 07 Y:2005 | 07 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,199 | $7,500 | Not Implemented |
UD0724 # 08 Y:2005 | 08 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,477 | $0 | Not Implemented |
UD0724 # 09 Y:2005 | 09 | 2005 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $3,364 | $0 | Implemented |
UD0724 # 10 Y:2005 | 10 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,915 | $0 | Not Implemented |
UD0724 # 11 Y:2005 | 11 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $471 | $880 | Implemented |
MI0072 # 01 Y:2004 | 01 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,447 | $800 | Implemented |
MI0072 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $-2,108 | $550 | Implemented |
MI0072 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,341 | $228 | Implemented |
MI0072 # 04 Y:2004 | 04 | 2004 | REDUCE DEFECTS BY REDUCING PRODUCT TIPPING | $221,675 | $0 | Implemented |
MI0072 # 05 Y:2004 | 05 | 2004 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $16,550 | $2,176 | Not Implemented |
MI0012 # 01 Y:2001 | 01 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $656 | $260 | Implemented |
MI0012 # 02 Y:2001 | 02 | 2001 | UTILIZE JOB COSTING SOFTWARE | $58,500 | $12,000 | Implemented |