Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
309
matching recommendationsSIC | 3537 | Industrial Trucks And Tractors |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1084 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,134 | $3,775 | n/a |
UD1084 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $1,251 | $3,985 | n/a |
UD1084 # 04 Y:2024 | 04 | 2024 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $47,804 | $143,413 | n/a |
UD1084 # 03 Y:2024 | 03 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,871 | $6,080 | n/a |
UD1084 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,258 | $1,235 | n/a |
UD1084 # 01 Y:2024 | 01 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,386 | $0 | n/a |
UU0247 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $864 | $7,540 | n/a |
UU0247 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,970 | $3,000 | n/a |
UU0247 # 02 Y:2024 | 02 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,770 | $9,500 | n/a |
UU0247 # 04 Y:2024 | 04 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $1,060 | $1,950 | n/a |
UU0247 # 03 Y:2024 | 03 | 2024 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $200,000 | $717,040 | n/a |
UD1082 # 08 Y:2024 | 08 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $3,575 | $11,626 | n/a |
UD1082 # 10 Y:2024 | 10 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $245 | $0 | n/a |
UD1082 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $1,431 | $2,001 | n/a |
UD1082 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,327 | $9,308 | n/a |
UD1082 # 04 Y:2024 | 04 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $35,677 | $0 | n/a |
UD1082 # 05 Y:2024 | 05 | 2024 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $20,600 | $93,250 | n/a |
UD1082 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,232 | $1,235 | n/a |
UD1082 # 09 Y:2024 | 09 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,739 | $18,600 | n/a |
UD1082 # 02 Y:2024 | 02 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,315 | $760 | n/a |
UD1082 # 06 Y:2024 | 06 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $12,369 | $0 | n/a |
WV0654 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,126 | $3,800 | n/a |
WV0654 # 17 Y:2023 | 17 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $176 | $240 | n/a |
WV0654 # 04 Y:2023 | 04 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,126 | $9,645 | n/a |
WV0654 # 03 Y:2023 | 03 | 2023 | REDUCE VENTILATION AIR | $5,594 | $13,814 | n/a |