IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

331

matching recommendations
Reset
SIC 3537 Industrial Trucks And Tractors
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0033 # 07 Y:2002 07 2002 USE PLASTIC PALLETS INSTEAD OF WOOD $10,750 $22,000 Implemented
IC0033 # 08 Y:2002 08 2002 ELIMINATE A BY-PRODUCT $6,316 $72,000 Not Implemented
CO0475 # 01 Y:2000 01 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,180 $4,580 Not Implemented
CO0475 # 02 Y:2000 02 2000 OPTIMIZE PLANT POWER FACTOR $3,330 $5,470 Not Implemented
CO0475 # 03 Y:2000 03 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,100 $6,000 Not Implemented
CO0475 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $300 $490 Implemented
CO0475 # 05 Y:2000 05 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,430 $0 Implemented
CO0475 # 06 Y:2000 06 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $34,630 $100,000 Implemented
CO0475 # 07 Y:2000 07 2000 INSTALL SYSTEM TO COLLECT SCRAP $14,590 $45,000 Not Implemented
CO0475 # 08 Y:2000 08 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $6,520 $20,000 Not Implemented
ND0360 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $886 $3,912 Not Implemented
ND0360 # 02 Y:2000 02 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,495 $0 Not Implemented
ND0360 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $611 $730 Not Implemented
ND0360 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,809 $80 Not Implemented
ND0360 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,566 $560 Implemented
ND0360 # 06 Y:2000 06 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $337 $300 Not Implemented
ND0360 # 07 Y:2000 07 2000 USE OPTIMUM TEMPERATURE $86 $20 Implemented
NV0157 # 01 Y:2000 01 2000 BURN A LESS EXPENSIVE GRADE OF FUEL $33,074 $25 Not Implemented
NV0157 # 02 Y:2000 02 2000 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $2,588 $700 Not Implemented
NV0157 # 03 Y:2000 03 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $96 $0 Not Implemented
NV0157 # 04 Y:2000 04 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $84 $0 Not Implemented
NV0157 # 05 Y:2000 05 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $191,450 $250,000 Not Implemented
NV0157 # 06 Y:2000 06 2000 ELIMINATE SHIFT $41,600 $7,395 Not Implemented
NV0157 # 07 Y:2000 07 2000 DEVELOP STANDARD OPERATING PROCEDURES $18,200 $0 Not Implemented
NC0170 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,515 $0 Implemented