IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 3537 Industrial Trucks And Tractors
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0441 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $273 $450 Not Implemented
BD0441 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $505 $20 Not Implemented
BD0441 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $300 $280 Implemented
BD0441 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,765 $3,000 Implemented
BD0441 # 06 Y:2014 06 2014 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $4,867 $83 Not Implemented
BD0441 # 07 Y:2014 07 2014 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $4,000 $900 Implemented
BD0441 # 08 Y:2014 08 2014 CHANGE OPERATING CONDITIONS $1,402 $30 Implemented
BD0441 # 01 Y:2014 01 2014 REPAIR AND ELIMINATE STEAM LEAKS $3,813 $2,600 Implemented
IC0033 # 07 Y:2002 07 2002 USE PLASTIC PALLETS INSTEAD OF WOOD $10,750 $22,000 Implemented
IC0033 # 08 Y:2002 08 2002 ELIMINATE A BY-PRODUCT $6,316 $72,000 Not Implemented
IC0033 # 06 Y:2002 06 2002 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $43,200 $8,500 Not Implemented
IC0033 # 05 Y:2002 05 2002 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $13,369 $27,400 Not Implemented
IC0033 # 04 Y:2002 04 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,179 $15,000 Not Implemented
IC0033 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,219 $1,700 Implemented
IC0033 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,622 $5,604 Implemented
IC0033 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,405 $97,350 Implemented
WI0201 # 01 Y:1994 01 1994 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $12,890 $42,825 Not Implemented
WI0201 # 02 Y:1994 02 1994 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,873 $2,800 Not Implemented
WI0201 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,555 $20,000 Not Implemented
WI0201 # 04 Y:1994 04 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $4,040 $800 Not Implemented
WI0201 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $287 $142 Not Implemented
WI0201 # 06 Y:1994 06 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,906 $800 Implemented
WI0201 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,915 $6,824 Implemented
WI0201 # 08 Y:1994 08 1994 INSTALL OCCUPANCY SENSORS $470 $375 Not Implemented
WI0201 # 09 Y:1994 09 1994 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,847 $0 Implemented