Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
82
matching recommendationsSIC | 354 | Metalworking Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0026 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $101,263 | $0 | Implemented |
MU0026 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $419 | $1,650 | Implemented |
MU0026 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $905 | $133 | Implemented |
MU0026 # 10 Y:2023 | 10 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,402 | $0 | Implemented |
MU0026 # 07 Y:2023 | 07 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,405 | $0 | Implemented |
MU0026 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,370 | $6,347 | Implemented |
CW0115 # 03 Y:2020 | 03 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $233 | $22 | Implemented |
CW0115 # 08 Y:2020 | 08 | 2020 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,017 | $10,620 | Implemented |
CW0115 # 06 Y:2020 | 06 | 2020 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $28 | $188 | Implemented |
CW0115 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $333 | $90 | Implemented |
UD0982 # 05 Y:2018 | 05 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,501 | $8,000 | Implemented |
UD0982 # 01 Y:2018 | 01 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $21,886 | $0 | Implemented |
UD0982 # 02 Y:2018 | 02 | 2018 | REDUCE VENTILATION AIR | $9,420 | $3,000 | Implemented |
UD0982 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,010 | $500 | Implemented |
UD0982 # 13 Y:2018 | 13 | 2018 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $13,372 | $10,000 | Implemented |
UD0982 # 12 Y:2018 | 12 | 2018 | ADD AREA LIGHTING SWITCHES | $675 | $500 | Implemented |
UD0982 # 11 Y:2018 | 11 | 2018 | INSTALL OCCUPANCY SENSORS | $5,167 | $1,500 | Implemented |
UD0982 # 10 Y:2018 | 10 | 2018 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $5,443 | $0 | Implemented |
UD0982 # 06 Y:2018 | 06 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,208 | $3,500 | Implemented |
UD0982 # 04 Y:2018 | 04 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,415 | $0 | Implemented |
UM0460 # 05 Y:2015 | 05 | 2015 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $5,072 | $4,000 | Implemented |
UM0460 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,160 | $1,100 | Implemented |
UM0460 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,526 | $161,000 | Implemented |
UM0437 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,700 | $5,700 | Implemented |
UM0437 # 01 Y:2013 | 01 | 2013 | OPTIMIZE PLANT POWER FACTOR | $11,350 | $4,000 | Implemented |