Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsSIC | 354 | Metalworking Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0746 # 07 Y:2015 | 07 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,874 | $2,960 | Implemented |
MA0746 # 06 Y:2015 | 06 | 2015 | REPAIR OR REPLACE STEAM TRAPS | $2,323 | $362 | Implemented |
MA0746 # 05 Y:2015 | 05 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,299 | $3,000 | Implemented |
MA0746 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,070 | $2,100 | Implemented |
MA0746 # 03 Y:2015 | 03 | 2015 | REDUCE VENTILATION AIR | $13,483 | $3,785 | Implemented |
MA0746 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,017 | $88,800 | Implemented |
MA0746 # 01 Y:2015 | 01 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $14,457 | $7,354 | Implemented |
MA0728 # 03 Y:2014 | 03 | 2014 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,940 | $6,500 | Implemented |
MA0728 # 02 Y:2014 | 02 | 2014 | REPLACE BOILER | $10,114 | $30,450 | Implemented |
MA0728 # 01 Y:2014 | 01 | 2014 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $16,512 | $25,775 | Implemented |
MA0329 # 09 Y:1995 | 09 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $343 | $333 | Implemented |
MA0329 # 08 Y:1995 | 08 | 1995 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,463 | $300 | Implemented |
MA0329 # 07 Y:1995 | 07 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,306 | $0 | Implemented |
MA0329 # 06 Y:1995 | 06 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,356 | $1,200 | Implemented |
MA0329 # 05 Y:1995 | 05 | 1995 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,663 | $9,216 | Implemented |
MA0329 # 04 Y:1995 | 04 | 1995 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,392 | $0 | Implemented |
MA0329 # 03 Y:1995 | 03 | 1995 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $5,088 | $1,950 | Implemented |
MA0329 # 02 Y:1995 | 02 | 1995 | PAY UTILITY BILLS ON TIME | $6,219 | $0 | Implemented |
MA0289 # 01 Y:1993 | 01 | 1993 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $8,282 | $20,878 | Implemented |
MA0289 # 04 Y:1993 | 04 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,948 | $180 | Implemented |
MA0289 # 03 Y:1993 | 03 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $486 | $67 | Implemented |