IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 354 Metalworking Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0289 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,948 $180 Implemented
MA0289 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $486 $67 Implemented
MA0289 # 01 Y:1993 01 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,282 $20,878 Implemented
GT0508 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $645 $1,130 Implemented
GT0508 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,255 $9,240 Implemented
GT0508 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,615 $6,380 Implemented
UD0413 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,521 $7,698 Implemented
UD0413 # 04 Y:1993 04 1993 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,336 $82,000 Implemented
UD0413 # 05 Y:1993 05 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,344 $250 Implemented
UD0413 # 01 Y:1993 01 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,642 $0 Implemented
WI0185 # 05 Y:1993 05 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,295 $0 Implemented
WI0185 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,556 $2,336 Implemented
WI0185 # 02 Y:1993 02 1993 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,773 $0 Implemented
ME0103 # 05 Y:1993 05 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,120 $700 Implemented
ME0103 # 07 Y:1993 07 1993 PAY UTILITY BILLS ON TIME $2,223 $0 Implemented
ME0102 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,038 $7,200 Implemented
ME0102 # 04 Y:1993 04 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,674 $1,400 Implemented
IA0048 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,403 $500 Implemented
IA0048 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,254 $272 Implemented
IA0048 # 06 Y:1993 06 1993 INSULATE BARE EQUIPMENT $25 $43 Implemented
UD0393 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,178 $2,100 Implemented
UD0393 # 01 Y:1993 01 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,566 $0 Implemented