Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsSIC | 354 | Metalworking Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0439 # 08 Y:2013 | 08 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $341 | $350 | Implemented |
BD0439 # 07 Y:2013 | 07 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $400 | $20 | Implemented |
BD0439 # 01 Y:2013 | 01 | 2013 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $6,296 | $50 | Implemented |
BD0439 # 03 Y:2013 | 03 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,900 | $1,000 | Implemented |
BD0439 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $813 | $795 | Implemented |
UM0437 # 01 Y:2013 | 01 | 2013 | OPTIMIZE PLANT POWER FACTOR | $11,350 | $4,000 | Implemented |
UM0437 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,700 | $5,700 | Implemented |
UM0437 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,430 | $510 | Implemented |
MZ0118 # 09 Y:2013 | 09 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $50 | $0 | Implemented |
MZ0118 # 10 Y:2013 | 10 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $21 | $60 | Implemented |
MZ0118 # 11 Y:2013 | 11 | 2013 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $702 | $9,752 | Implemented |
MZ0118 # 08 Y:2013 | 08 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $247 | $100 | Implemented |
MZ0118 # 06 Y:2013 | 06 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,418 | $0 | Implemented |
MZ0118 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,699 | $0 | Implemented |
MZ0118 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,880 | $950 | Implemented |
MZ0118 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,135 | $24,628 | Implemented |
BS0018 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,122 | $7,317 | Implemented |
BS0018 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $152 | $600 | Implemented |
BS0018 # 01 Y:2013 | 01 | 2013 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $552 | $934 | Implemented |
SD0472 # 06 Y:2013 | 06 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $568 | $200 | Implemented |
SD0472 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $952 | $2,197 | Implemented |
SD0472 # 04 Y:2013 | 04 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,650 | $3,900 | Implemented |
SD0472 # 03 Y:2013 | 03 | 2013 | USE PHOTOCELL CONTROLS | $4,079 | $11,220 | Implemented |
SD0472 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,979 | $900 | Implemented |
SD0472 # 01 Y:2013 | 01 | 2013 | INSTALL TIMERS AND/OR THERMOSTATS | $7,834 | $3,850 | Implemented |