IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,919

matching recommendations
Reset
SIC 354 Metalworking Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0293 # 09 Y:2010 09 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $337 $898 Not Implemented
SU0293 # 10 Y:2010 10 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $609 $2,721 Not Implemented
SU0293 # 11 Y:2010 11 2010 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,796 $150,000 Not Implemented
SU0293 # 12 Y:2010 12 2010 UPGRADE OBSOLETE EQUIPMENT $2,203 $19,090 Not Implemented
UM0362 # 01 Y:2010 01 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $27,064 $1,500 Not Implemented
UM0362 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,058 $89,000 Implemented
UM0362 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $12,351 $500 Implemented
UM0362 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,185 $400 Implemented
UM0362 # 05 Y:2010 05 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,961 $3,048 Implemented
UM0362 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $3,523 $6,072 Not Implemented
UM0362 # 07 Y:2010 07 2010 INSTALL STORM WINDOWS AND DOORS $3,301 $3,000 Implemented
UM0362 # 08 Y:2010 08 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,257 $2,000 Implemented
NC0398 # 01 Y:2010 01 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $35,525 $20,000 Implemented
NC0398 # 02 Y:2010 02 2010 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $68,552 $57,900 Not Implemented
NC0398 # 03 Y:2010 03 2010 AIR CONDITION ONLY SPACE NECESSARY $9,565 $18,450 Not Implemented
NC0398 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,697 $200 Implemented
NC0398 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,751 $14,000 Not Implemented
NC0398 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,554 $1,205 Implemented
NC0398 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $93,642 $225,498 Implemented
SU0287 # 01 Y:2010 01 2010 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,962 $0 Implemented
SU0287 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,424 $0 Implemented
SU0287 # 03 Y:2010 03 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,705 $0 Implemented
SU0287 # 04 Y:2010 04 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,358 $0 Not Implemented
SU0287 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,950 $338 Implemented
SU0287 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,701 $1,174 Implemented