IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,933

matching recommendations
Reset
SIC 354 Metalworking Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0080 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $761 $560 Not Implemented
NL0080 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,163 $4,000 Implemented
NL0080 # 03 Y:2023 03 2023 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,846 $4,160 Implemented
NL0080 # 02 Y:2023 02 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,690 $38,085 Not Implemented
NL0080 # 01 Y:2023 01 2023 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $7,794 $120 Implemented
MU0026 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,370 $6,347 Implemented
MU0026 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $905 $133 Implemented
MU0026 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $101,263 $0 Implemented
MU0026 # 04 Y:2023 04 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $181 $0 Not Implemented
MU0026 # 05 Y:2023 05 2023 USE PHOTOCELL CONTROLS $88 $349 Not Implemented
MU0026 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $419 $1,650 Implemented
MU0026 # 07 Y:2023 07 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,405 $0 Implemented
MU0026 # 08 Y:2023 08 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $23,547 $85,720 Not Implemented
MU0026 # 09 Y:2023 09 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $211 $522 Not Implemented
MU0026 # 10 Y:2023 10 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,402 $0 Implemented
UC2303 # 09 Y:2023 09 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $11,455 $55,867 Not Implemented
UC2303 # 08 Y:2023 08 2023 USE HEAT PUMP FOR SPACE CONDITIONING $3,229 $13,224 Not Implemented
UC2303 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $47,312 $455,896 Not Implemented
UC2303 # 06 Y:2023 06 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,257 $36,220 Not Implemented
UC2303 # 05 Y:2023 05 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $16,066 $176,604 Not Implemented
UC2303 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $1,129 $500 Not Implemented
UC2303 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $870 $2,800 Not Implemented
UC2303 # 02 Y:2023 02 2023 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $115 $696 Not Implemented
UC2303 # 01 Y:2023 01 2023 INSULATE BARE EQUIPMENT $284 $500 Not Implemented
SD0630 # 08 Y:2023 08 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,832 $1,080 Implemented