Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
119
matching recommendationsSIC | 354 | Metalworking Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LM0049 # 06 Y:2003 | 06 | 2003 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $198,375 | $32,670 | Not Implemented |
LM0049 # 07 Y:2003 | 07 | 2003 | ADVERTISE PRODUCT OR SERVICE | $242,800 | $2,000 | Not Implemented |
LM0049 # 08 Y:2003 | 08 | 2003 | DEVELOP STANDARD OPERATING PROCEDURES | $120,000 | $7,997 | Not Implemented |
LM0008 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,518 | $500 | Implemented |
LM0008 # 02 Y:2001 | 02 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $44,725 | $15,270 | Not Implemented |
LM0008 # 03 Y:2001 | 03 | 2001 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $787 | $0 | Implemented |
LM0008 # 04 Y:2001 | 04 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,758 | $1,463 | Not Implemented |
LM0008 # 05 Y:2001 | 05 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $36,000 | $27,600 | Implemented |
LM0008 # 06 Y:2001 | 06 | 2001 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $146,432 | $17,000 | Implemented |
LM0008 # 07 Y:2001 | 07 | 2001 | HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME | $332,648 | $0 | Implemented |
SF0212 # 01 Y:2001 | 01 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $847 | $1,513 | Implemented |
SF0212 # 02 Y:2001 | 02 | 2001 | INSTALL OCCUPANCY SENSORS | $261 | $600 | Implemented |
SF0212 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $422 | $1,536 | Not Implemented |
SF0212 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $953 | $4,666 | Implemented |
SF0212 # 05 Y:2001 | 05 | 2001 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $18,923 | $15,000 | Not Implemented |
NV0170 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,657 | $360 | Implemented |
NV0170 # 02 Y:2000 | 02 | 2000 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,709 | $95 | Not Implemented |
NV0170 # 03 Y:2000 | 03 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $985 | $100 | Implemented |
NV0170 # 04 Y:2000 | 04 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $8,109 | $14,542 | Implemented |
SD0251 # 01 Y:2000 | 01 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,187 | $350 | Not Implemented |
SD0251 # 02 Y:2000 | 02 | 2000 | INSULATE BARE EQUIPMENT | $4,966 | $664 | Not Implemented |
SD0251 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,693 | $5,000 | Not Implemented |
SD0251 # 04 Y:2000 | 04 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,316 | $5,000 | Not Implemented |
SD0251 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,040 | $200 | Implemented |
SD0251 # 06 Y:2000 | 06 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,438 | $1,438 | Implemented |