Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,933
matching recommendationsSIC | 354 | Metalworking Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0413 # 01 Y:1993 | 01 | 1993 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,642 | $0 | Implemented |
UD0413 # 02 Y:1993 | 02 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $655 | $0 | Not Implemented |
UD0413 # 03 Y:1993 | 03 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,521 | $7,698 | Implemented |
UD0413 # 04 Y:1993 | 04 | 1993 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,336 | $82,000 | Implemented |
UD0413 # 05 Y:1993 | 05 | 1993 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,344 | $250 | Implemented |
WI0185 # 01 Y:1993 | 01 | 1993 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $21,039 | $0 | Not Implemented |
WI0185 # 02 Y:1993 | 02 | 1993 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,773 | $0 | Implemented |
WI0185 # 03 Y:1993 | 03 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,604 | $77,000 | Not Implemented |
WI0185 # 04 Y:1993 | 04 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,556 | $2,336 | Implemented |
WI0185 # 05 Y:1993 | 05 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,295 | $0 | Implemented |
WI0185 # 06 Y:1993 | 06 | 1993 | INSTALL OCCUPANCY SENSORS | $3,859 | $900 | Not Implemented |
WI0185 # 07 Y:1993 | 07 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,407 | $0 | Not Implemented |
WI0185 # 08 Y:1993 | 08 | 1993 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,577 | $1,200 | Not Implemented |
WI0185 # 09 Y:1993 | 09 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,819 | $0 | Not Implemented |
WI0185 # 10 Y:1993 | 10 | 1993 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,596 | $5,600 | Not Implemented |
WI0185 # 11 Y:1993 | 11 | 1993 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,588 | $5,000 | Not Implemented |
WI0185 # 12 Y:1993 | 12 | 1993 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,112 | $2,455 | Not Implemented |
ME0103 # 01 Y:1993 | 01 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,228 | $180 | Not Implemented |
ME0103 # 02 Y:1993 | 02 | 1993 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,470 | $1,300 | Not Implemented |
ME0103 # 03 Y:1993 | 03 | 1993 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $69,216 | $175,000 | Not Implemented |
ME0103 # 04 Y:1993 | 04 | 1993 | SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS | $8,100 | $20,000 | Not Implemented |
ME0103 # 05 Y:1993 | 05 | 1993 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,120 | $700 | Implemented |
ME0103 # 06 Y:1993 | 06 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $14,129 | $13,680 | Not Implemented |
ME0103 # 07 Y:1993 | 07 | 1993 | PAY UTILITY BILLS ON TIME | $2,223 | $0 | Implemented |
ME0102 # 01 Y:1993 | 01 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $486 | $90 | Not Implemented |