Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
94
matching recommendationsSIC | 354 | Metalworking Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ME0234 # 08 Y:1998 | 08 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $150 | $0 | Not Implemented |
ME0234 # 04 Y:1998 | 04 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,482 | $4,476 | Implemented |
ME0234 # 07 Y:1998 | 07 | 1998 | RECOVER AND REUSE COOLING WATER | $12,512 | $12,000 | Implemented |
ME0234 # 06 Y:1998 | 06 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $975 | $500 | Implemented |
ME0234 # 02 Y:1998 | 02 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $19,979 | $12,932 | Implemented |
ME0234 # 01 Y:1998 | 01 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $38,400 | $50,000 | Implemented |
ME0234 # 10 Y:1998 | 10 | 1998 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $1,114 | $7,000 | Implemented |
ME0234 # 05 Y:1998 | 05 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,284 | $800 | Implemented |
ME0234 # 03 Y:1998 | 03 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,153 | $10,580 | Implemented |
ME0234 # 09 Y:1998 | 09 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,887 | $3,000 | Not Implemented |
DS0125 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,442 | $5,715 | Not Implemented |
DS0125 # 02 Y:1998 | 02 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,211 | $120 | Implemented |
DS0125 # 07 Y:1998 | 07 | 1998 | INSTALL EQUIPMENT TO MOVE PRODUCT | $86,832 | $45,000 | Not Implemented |
DS0125 # 04 Y:1998 | 04 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $25,208 | $74,000 | Not Implemented |
DS0125 # 03 Y:1998 | 03 | 1998 | INSULATE BARE EQUIPMENT | $11,394 | $2,450 | Not Implemented |
DS0125 # 06 Y:1998 | 06 | 1998 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $3,714 | $1,350 | Not Implemented |
DS0125 # 05 Y:1998 | 05 | 1998 | MINIMIZE WATER USAGE | $10,382 | $3,088 | Implemented |
UM0126 # 02 Y:1998 | 02 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,221 | $938 | Not Implemented |
UM0126 # 03 Y:1998 | 03 | 1998 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $20,053 | $5,250 | Implemented |
UM0126 # 04 Y:1998 | 04 | 1998 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $24,729 | $250 | Not Implemented |
UM0126 # 05 Y:1998 | 05 | 1998 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $21,553 | $80,000 | Not Implemented |
UM0126 # 06 Y:1998 | 06 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $862 | $1,000 | Implemented |
UM0126 # 08 Y:1998 | 08 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,264 | $1,800 | Implemented |
UM0126 # 09 Y:1998 | 09 | 1998 | RECOVER AND REUSE COOLING WATER | $6,202 | $4,500 | Implemented |
UM0126 # 11 Y:1998 | 11 | 1998 | CLEAR AND RENT EXISTING SPACE | $151,198 | $5,000 | Not Implemented |