IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 354 Metalworking Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0088 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,547 $400 Implemented
IC0088 # 01 Y:2004 01 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,664 $0 Implemented
IC0088 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,571 $20,087 Not Implemented
IC0088 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,563 $459 Implemented
IC0088 # 04 Y:2004 04 2004 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $3,021 $21,693 Not Implemented
IC0088 # 05 Y:2004 05 2004 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $505 $1,420 Not Implemented
UM0262 # 01 Y:2004 01 2004 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,974 $1,200 Not Implemented
UM0262 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,197 $500 Not Implemented
UM0262 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,427 $1,910 Not Implemented
UM0262 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,194 $1,248 Implemented
UM0262 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,373 $300 Not Implemented
UM0262 # 03 Y:2004 03 2004 AIR CONDITION ONLY SPACE NECESSARY $2,293 $1,410 Not Implemented
UM0262 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $4,751 $27,856 Not Implemented
UM0262 # 08 Y:2004 08 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $639 $1,000 Not Implemented
WI0470 # 08 Y:2004 08 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $579 $0 Not Implemented
TA0074 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,000 $14,432 Not Implemented
TA0074 # 02 Y:2004 02 2004 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,340 $72 Not Implemented
TA0074 # 04 Y:2004 04 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,590 $43 Implemented
TA0074 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,504 $360 Implemented
TA0074 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $625 $600 Implemented
WI0470 # 06 Y:2004 06 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,293 $0 Implemented
WI0470 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $1,484 $896 Implemented
WI0470 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,353 $5,780 Implemented
WI0470 # 03 Y:2004 03 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,832 $0 Not Implemented
WI0470 # 02 Y:2004 02 2004 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $4,976 $28,750 Not Implemented