Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
71
matching recommendationsSIC | 354 | Metalworking Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0293 # 06 Y:2005 | 06 | 2005 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $227 | $200 | Implemented |
UM0293 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,506 | $175 | Implemented |
UM0293 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,861 | $18,165 | Implemented |
UM0293 # 04 Y:2005 | 04 | 2005 | OPTIMIZE PLANT POWER FACTOR | $3,999 | $2,728 | Not Implemented |
UM0293 # 03 Y:2005 | 03 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,085 | $50 | Implemented |
UM0293 # 05 Y:2005 | 05 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,239 | $0 | Not Implemented |
SD0372 # 09 Y:2005 | 09 | 2005 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,612 | $784 | Not Implemented |
SD0372 # 01 Y:2005 | 01 | 2005 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $11,522 | $12,000 | Not Implemented |
SD0372 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,816 | $2,580 | Not Implemented |
SD0372 # 03 Y:2005 | 03 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,082 | $6,984 | Not Implemented |
SD0372 # 04 Y:2005 | 04 | 2005 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,072 | $11,250 | Not Implemented |
SD0372 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,173 | $140 | Implemented |
SD0372 # 06 Y:2005 | 06 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,592 | $688 | Not Implemented |
SD0372 # 07 Y:2005 | 07 | 2005 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,147 | $350 | Not Implemented |
SD0372 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,723 | $16,563 | Implemented |
MA0583 # 02 Y:2005 | 02 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,360 | $1,180 | Implemented |
MA0583 # 08 Y:2005 | 08 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $79 | $318 | Implemented |
MA0583 # 07 Y:2005 | 07 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $105 | $296 | Implemented |
MA0583 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $228 | $0 | Implemented |
MA0583 # 05 Y:2005 | 05 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $826 | $0 | Implemented |
MA0583 # 04 Y:2005 | 04 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,148 | $0 | Implemented |
MA0583 # 03 Y:2005 | 03 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,215 | $0 | Implemented |
MA0583 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,565 | $29,567 | Implemented |
MA0587 # 03 Y:2005 | 03 | 2005 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $875 | $1,210 | Implemented |
MA0587 # 01 Y:2005 | 01 | 2005 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $32,448 | $600 | Not Implemented |