Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
40
matching recommendationsSIC | 354 | Metalworking Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0439 # 06 Y:2013 | 06 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $535 | $395 | Not Implemented |
BD0439 # 08 Y:2013 | 08 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $341 | $350 | Implemented |
BD0439 # 01 Y:2013 | 01 | 2013 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $6,296 | $50 | Implemented |
BD0439 # 09 Y:2013 | 09 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $293 | $300 | Not Implemented |
BD0439 # 07 Y:2013 | 07 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $400 | $20 | Implemented |
BD0439 # 02 Y:2013 | 02 | 2013 | USE RADIANT HEATER FOR SPOT HEATING | $4,775 | $6,000 | Not Implemented |
BD0439 # 03 Y:2013 | 03 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,900 | $1,000 | Implemented |
BD0439 # 04 Y:2013 | 04 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,797 | $3,310 | Not Implemented |
BD0439 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $813 | $795 | Implemented |
UM0437 # 03 Y:2013 | 03 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,400 | $10,000 | Not Implemented |
UM0437 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,400 | $200 | Not Implemented |
UM0437 # 01 Y:2013 | 01 | 2013 | OPTIMIZE PLANT POWER FACTOR | $11,350 | $4,000 | Implemented |
UM0437 # 05 Y:2013 | 05 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,000 | $2,500 | Not Implemented |
UM0437 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,700 | $5,700 | Implemented |
UM0437 # 08 Y:2013 | 08 | 2013 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,177 | $4,660 | Not Implemented |
UM0437 # 04 Y:2013 | 04 | 2013 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $11,900 | $5,000 | Not Implemented |
UM0437 # 09 Y:2013 | 09 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,800 | $1,500 | Not Implemented |
UM0437 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,430 | $510 | Implemented |
MZ0118 # 10 Y:2013 | 10 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $21 | $60 | Implemented |
MZ0118 # 09 Y:2013 | 09 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $50 | $0 | Implemented |
MZ0118 # 08 Y:2013 | 08 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $247 | $100 | Implemented |
MZ0118 # 07 Y:2013 | 07 | 2013 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,099 | $0 | Not Implemented |
MZ0118 # 06 Y:2013 | 06 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,418 | $0 | Implemented |
MZ0118 # 05 Y:2013 | 05 | 2013 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $10,146 | $59,000 | Not Implemented |
MZ0118 # 02 Y:2013 | 02 | 2013 | INSTALL OCCUPANCY SENSORS | $3,261 | $1,020 | Not Implemented |