Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsSIC | 3541 | Machine Tools, Metal Cutting Types |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0213 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $463 | $1,730 | Not Implemented |
WM0213 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,049 | $125 | Implemented |
WM0213 # 04 Y:2024 | 04 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,240 | $2,590 | Implemented |
WM0213 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $2,965 | $267 | Not Implemented |
WM0213 # 02 Y:2024 | 02 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $3,521 | $16,500 | Not Implemented |
WM0213 # 01 Y:2024 | 01 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $10,341 | $20,389 | Implemented |
WI0470 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $1,484 | $896 | Implemented |
WI0470 # 08 Y:2004 | 08 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $579 | $0 | Not Implemented |
WI0470 # 07 Y:2004 | 07 | 2004 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,075 | $4,000 | Not Implemented |
WI0470 # 06 Y:2004 | 06 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,293 | $0 | Implemented |
WI0470 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,353 | $5,780 | Implemented |
WI0470 # 03 Y:2004 | 03 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,832 | $0 | Not Implemented |
WI0470 # 02 Y:2004 | 02 | 2004 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $4,976 | $28,750 | Not Implemented |
WI0470 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,014 | $26,070 | Not Implemented |
WI0445 # 01 Y:2003 | 01 | 2003 | REPLACE CLOTH RAGS WITH PAPER TOWELS | $4,725 | $0 | Implemented |
WI0445 # 06 Y:2003 | 06 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $422 | $640 | Implemented |
WI0445 # 05 Y:2003 | 05 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $1,111 | $2,500 | Not Implemented |
WI0445 # 04 Y:2003 | 04 | 2003 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $1,188 | $1,000 | Not Implemented |
WI0445 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,188 | $4,400 | Not Implemented |
WI0445 # 02 Y:2003 | 02 | 2003 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $3,022 | $10,000 | n/a |