IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

123

matching recommendations
Reset
SIC 3542 Machine Tools, Metal Forming Types
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0170 # 04 Y:2000 04 2000 RECOVER AND REUSE WASTE MATERIAL $8,109 $14,542 Implemented
DS0169 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,062 $246 Implemented
DS0169 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,000 $2,943 Implemented
DS0169 # 05 Y:2000 05 2000 BURN WASTE OIL FOR HEAT $5,018 $1,695 Implemented
DS0169 # 07 Y:2000 07 2000 DISTILL CONTAMINATED SOLVENTS FOR REUSE $3,694 $4,083 Implemented
DS0169 # 08 Y:2000 08 2000 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $5,929 $12,962 Implemented
DS0169 # 09 Y:2000 09 2000 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $600 $1,288 Implemented
UM0126 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,401 $25,843 Implemented
UM0126 # 03 Y:1998 03 1998 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $20,053 $5,250 Implemented
UM0126 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $862 $1,000 Implemented
UM0126 # 07 Y:1998 07 1998 RECOVER WASTE HEAT FROM EQUIPMENT $9,603 $2,000 Implemented
UM0126 # 08 Y:1998 08 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,264 $1,800 Implemented
UM0126 # 09 Y:1998 09 1998 RECOVER AND REUSE COOLING WATER $6,202 $4,500 Implemented
UM0126 # 10 Y:1998 10 1998 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $200,000 $0 Implemented
CO0344 # 01 Y:1995 01 1995 IMPROVE COMBUSTION CONTROL CAPABILITY $32,610 $165,000 Implemented
CO0344 # 02 Y:1995 02 1995 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $2,980 $2,670 Implemented
CO0344 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,690 $100 Implemented
CO0344 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,660 $5,920 Implemented
CO0344 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,250 $780 Implemented
CO0344 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,110 $2,080 Implemented
ND0042 # 01 Y:1992 01 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,027 $350 Implemented
ND0042 # 02 Y:1992 02 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $759 $7,880 Implemented
ND0042 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $305 $10,000 Implemented
ND0042 # 04 Y:1992 04 1992 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $186 $436 Implemented
ND0042 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $241 $88 Implemented