Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
228
matching recommendationsSIC | 3542 | Machine Tools, Metal Forming Types |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0623 # 08 Y:2001 | 08 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $756 | $3,000 | Implemented |
UD0623 # 09 Y:2001 | 09 | 2001 | INSTALL TIMERS AND/OR THERMOSTATS | $675 | $225 | Not Implemented |
UD0623 # 10 Y:2001 | 10 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $641 | $436 | Not Implemented |
NV0170 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,657 | $360 | Implemented |
NV0170 # 02 Y:2000 | 02 | 2000 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,709 | $95 | Not Implemented |
NV0170 # 03 Y:2000 | 03 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $985 | $100 | Implemented |
NV0170 # 04 Y:2000 | 04 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $8,109 | $14,542 | Implemented |
DS0169 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,062 | $246 | Implemented |
DS0169 # 02 Y:2000 | 02 | 2000 | USE OPTIMUM THICKNESS INSULATION | $496 | $316 | Not Implemented |
DS0169 # 03 Y:2000 | 03 | 2000 | INSTALL OCCUPANCY SENSORS | $850 | $1,512 | Not Implemented |
DS0169 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,000 | $2,943 | Implemented |
DS0169 # 05 Y:2000 | 05 | 2000 | BURN WASTE OIL FOR HEAT | $5,018 | $1,695 | Implemented |
DS0169 # 06 Y:2000 | 06 | 2000 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $1,398 | $4,230 | Not Implemented |
DS0169 # 07 Y:2000 | 07 | 2000 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $3,694 | $4,083 | Implemented |
DS0169 # 08 Y:2000 | 08 | 2000 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $5,929 | $12,962 | Implemented |
DS0169 # 09 Y:2000 | 09 | 2000 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $600 | $1,288 | Implemented |
UM0126 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,401 | $25,843 | Implemented |
UM0126 # 02 Y:1998 | 02 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,221 | $938 | Not Implemented |
UM0126 # 03 Y:1998 | 03 | 1998 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $20,053 | $5,250 | Implemented |
UM0126 # 04 Y:1998 | 04 | 1998 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $24,729 | $250 | Not Implemented |
UM0126 # 05 Y:1998 | 05 | 1998 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $21,553 | $80,000 | Not Implemented |
UM0126 # 06 Y:1998 | 06 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $862 | $1,000 | Implemented |
UM0126 # 07 Y:1998 | 07 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,603 | $2,000 | Implemented |
UM0126 # 08 Y:1998 | 08 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,264 | $1,800 | Implemented |
UM0126 # 09 Y:1998 | 09 | 1998 | RECOVER AND REUSE COOLING WATER | $6,202 | $4,500 | Implemented |