Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
75
matching recommendationsSIC | 3545 | Machine Tool Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0431 # 07 Y:2011 | 07 | 2011 | INSTALL OCCUPANCY SENSORS | $2,808 | $408 | Implemented |
WV0431 # 06 Y:2011 | 06 | 2011 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,020 | $0 | Not Implemented |
WV0431 # 04 Y:2011 | 04 | 2011 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,105 | $1,850 | Implemented |
WV0431 # 03 Y:2011 | 03 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,355 | $11,500 | Not Implemented |
WV0431 # 02 Y:2011 | 02 | 2011 | USE OPTIMUM THICKNESS INSULATION | $29,707 | $75,000 | Not Implemented |
WV0431 # 08 Y:2011 | 08 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,027 | $1,560 | Implemented |
WV0431 # 01 Y:2011 | 01 | 2011 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $135,254 | $682,000 | Implemented |
WV0431 # 05 Y:2011 | 05 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $6,207 | $1,076 | Implemented |
UD0837 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,500 | $2,916 | Not Implemented |
UD0837 # 06 Y:2011 | 06 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $234 | $25 | Not Implemented |
UD0837 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,869 | $4,935 | Not Implemented |
UD0837 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,572 | $7,595 | Not Implemented |
UD0837 # 13 Y:2011 | 13 | 2011 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,991 | $11,835 | Not Implemented |
UD0837 # 10 Y:2011 | 10 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,017 | $500 | Not Implemented |
UD0837 # 09 Y:2011 | 09 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $538 | $75 | Not Implemented |
UD0837 # 12 Y:2011 | 12 | 2011 | ISOLATE HOT OR COLD EQUIPMENT | $2,952 | $11,720 | Not Implemented |
UD0837 # 11 Y:2011 | 11 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,692 | $25,000 | Not Implemented |
UD0837 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $382 | $2,281 | Not Implemented |
UD0837 # 05 Y:2011 | 05 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $1,689 | $3,536 | Not Implemented |
UD0837 # 07 Y:2011 | 07 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,735 | $50 | Not Implemented |
UD0837 # 08 Y:2011 | 08 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,623 | $1,200 | Not Implemented |
WV0374 # 02 Y:2008 | 02 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $15,831 | $2,213 | Implemented |
WV0374 # 01 Y:2008 | 01 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,144 | $12,730 | Implemented |
WV0374 # 12 Y:2008 | 12 | 2008 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $389 | $690 | Not Implemented |
WV0374 # 11 Y:2008 | 11 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,750 | $1,884 | Not Implemented |