Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

263

matching recommendations
Reset
SIC 3545 Machine Tool Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0331 # 04 Y:2007 04 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $788 $500 Not Implemented
UM0331 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,146 $12,000 Implemented
UM0331 # 03 Y:2007 03 2007 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $2,277 $4,600 Not Implemented
UM0331 # 01 Y:2007 01 2007 RECOVER AND REUSE WASTE MATERIAL $37,752 $38,000 Not Implemented
UM0331 # 05 Y:2007 05 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $606 $0 Implemented
UF0356 # 03 Y:2005 03 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $6,348 $2,000 Implemented
UF0356 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,008 $700 Implemented
UF0356 # 02 Y:2005 02 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,843 $21,108 Implemented
UF0356 # 05 Y:2005 05 2005 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,918 $1,185 Not Implemented
UF0356 # 01 Y:2005 01 2005 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $0 $150,000 Not Implemented
UF0356 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $1,232 $1,450 Implemented
UF0356 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96 $245 Implemented
UF0356 # 09 Y:2005 09 2005 RECYCLE FLUORESCENT LAMPS $0 $3,496 Implemented
UF0356 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,295 $2,194 Implemented
TA0074 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,000 $14,432 Not Implemented
TA0074 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $625 $600 Implemented
TA0074 # 03 Y:2004 03 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,340 $2,128 Implemented
TA0074 # 02 Y:2004 02 2004 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,340 $72 Not Implemented
TA0074 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,504 $360 Implemented
TA0074 # 04 Y:2004 04 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,590 $43 Implemented
UM0246 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,380 $500 Implemented
UM0246 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,885 $100 Implemented
UM0246 # 06 Y:2004 06 2004 ADD AREA LIGHTING SWITCHES $620 $600 Not Implemented
UM0246 # 02 Y:2004 02 2004 INSULATE BARE EQUIPMENT $6,140 $700 Implemented
UM0246 # 01 Y:2004 01 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,080 $26,630 Not Implemented