Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
40
matching recommendationsSIC | 3549 | Metalworking Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CW0112 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,658 | $100 | Implemented |
CW0112 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,912 | $330 | Implemented |
CW0112 # 13 Y:2020 | 13 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,095 | $16,500 | Implemented |
CW0112 # 12 Y:2020 | 12 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $342 | $0 | Implemented |
CW0112 # 11 Y:2020 | 11 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,024 | $6,471 | Not Implemented |
CW0112 # 10 Y:2020 | 10 | 2020 | INCREASE USE OF AUTOMATION | $749,435 | $60,000 | Implemented |
CW0112 # 09 Y:2020 | 09 | 2020 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $51,045 | $2,000 | Implemented |
CW0112 # 08 Y:2020 | 08 | 2020 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $7,871 | $14,588 | Not Implemented |
CW0112 # 07 Y:2020 | 07 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,966 | $800 | Implemented |
CW0112 # 06 Y:2020 | 06 | 2020 | TREAT AND REUSE RINSE WATERS | $15,861 | $10,000 | Implemented |
CW0112 # 05 Y:2020 | 05 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,268 | $3,429 | Not Implemented |
CW0112 # 04 Y:2020 | 04 | 2020 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,678 | $800 | Implemented |
CW0112 # 03 Y:2020 | 03 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,643 | $848 | Not Implemented |
WV0503 # 10 Y:2015 | 10 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $272 | $1,250 | Not Implemented |
WV0503 # 09 Y:2015 | 09 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $283 | $630 | Implemented |
WV0503 # 08 Y:2015 | 08 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $407 | $448 | Implemented |
WV0503 # 07 Y:2015 | 07 | 2015 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $915 | $1,000 | Implemented |
WV0503 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,499 | $3,530 | Implemented |
WV0503 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,831 | $374 | Implemented |
WV0503 # 04 Y:2015 | 04 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,899 | $500 | Implemented |
WV0503 # 03 Y:2015 | 03 | 2015 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,630 | $5,700 | Not Implemented |
WV0503 # 02 Y:2015 | 02 | 2015 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,444 | $22,500 | Not Implemented |
WV0503 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,355 | $27,692 | Not Implemented |
UD0632 # 05 Y:2001 | 05 | 2001 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $5,264 | $0 | Implemented |
UD0632 # 01 Y:2001 | 01 | 2001 | OPTIMIZE PLANT POWER FACTOR | $94,812 | $8,000 | Implemented |