Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,577

matching recommendations
Reset
SIC 355 Special Industry Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0636 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $6,525 $1,500 Not Implemented
OK0636 # 04 Y:2002 04 2002 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $175,200 $12,800 Implemented
OK0636 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,410 $1,400 Implemented
OK0636 # 06 Y:2002 06 2002 BURN WOOD BY-PRODUCTS FOR HEAT $15,400 $22,800 Not Implemented
AM0409 # 01 Y:2002 01 2002 OPTIMIZE PLANT POWER FACTOR $10,660 $15,375 Implemented
AM0409 # 02 Y:2002 02 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,870 $12,210 Implemented
AM0409 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,120 $6,440 Implemented
AM0409 # 04 Y:2002 04 2002 REUSE RAGS UNTIL COMPLETELY SOILED $1,850 $0 Implemented
AM0409 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,600 $800 Implemented
AM0409 # 06 Y:2002 06 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,140 $0 Implemented
AM0409 # 07 Y:2002 07 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $840 $170 Not Implemented
AM0409 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $800 $300 Not Implemented
AM0409 # 09 Y:2002 09 2002 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $720 $0 Not Implemented
AM0409 # 10 Y:2002 10 2002 PAY BILLS ON TIME TO AVOID LATE FEES $253 $0 Implemented
LE0128 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,406 $2,500 Not Implemented
LE0128 # 02 Y:2002 02 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,470 $0 Not Implemented
LE0128 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $530 $1,280 Not Implemented
LE0128 # 04 Y:2002 04 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $793 $830 Not Implemented
LE0128 # 05 Y:2002 05 2002 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,794 $6,480 Not Implemented
SU0123 # 01 Y:2001 01 2001 ELIMINATE SHIFT $13,517 $0 Not Implemented
SU0123 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $2,968 $694 Implemented
SU0123 # 03 Y:2001 03 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,325 $7,060 Implemented
SU0123 # 04 Y:2001 04 2001 CHECK FOR ACCURACY OF UTILITY / POWER METERS $1,800 $0 Implemented
SU0123 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $739 $0 Implemented
SU0123 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $378 $196 Implemented