IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 355 Special Industry Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0484 # 07 Y:2019 07 2019 BURN A LESS EXPENSIVE GRADE OF FUEL $87,917 $290,000 Implemented
LE0484 # 06 Y:2019 06 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $16,879 $51,500 Implemented
LE0484 # 05 Y:2019 05 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,805 $5,500 Implemented
LE0484 # 01 Y:2019 01 2019 INSTALL TIMERS AND/OR THERMOSTATS $7,603 $0 Implemented
LE0484 # 02 Y:2019 02 2019 RECOVER WASTE HEAT FROM EQUIPMENT $5,873 $6,000 Implemented
LE0484 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,670 $2,500 Implemented
LE0484 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,910 $23,990 Implemented
LE0379 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,081 $40 Implemented
LE0379 # 02 Y:2014 02 2014 INSTALL TIMERS AND/OR THERMOSTATS $1,602 $225 Implemented
LE0379 # 03 Y:2014 03 2014 INSTALL TIMERS AND/OR THERMOSTATS $2,644 $900 Implemented
LE0379 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $396 $780 Implemented
LE0138 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $670 $0 Implemented
LE0138 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,471 $100 Implemented
LE0138 # 07 Y:2002 07 2002 USE OPTIMUM THICKNESS INSULATION $1,551 $60 Implemented
RU0093 # 04 Y:1990 04 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,811 $2,500 Implemented
RU0093 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,497 $183 Implemented
ST0009 # 08 Y:1984 08 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,149 $0 Implemented
ST0009 # 05 Y:1984 05 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $40 $50 Implemented
ST0009 # 04 Y:1984 04 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $136 $0 Implemented
ST0009 # 03 Y:1984 03 1984 SHUT OFF PILOTS IN STANDBY EQUIPMENT $50 $0 Implemented
ST0009 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $201 $537 Implemented