IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 355 Special Industry Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0406 # 02 Y:1990 02 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $4,734 $2,000 Not Implemented
TN0406 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,172 $10,820 Not Implemented
TN0406 # 04 Y:1990 04 1990 INSTALL SET-BACK TIMERS $2,139 $0 Not Implemented
TN0406 # 05 Y:1990 05 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,202 $0 Not Implemented
TN0406 # 06 Y:1990 06 1990 KEEP LAMPS AND REFLECTORS CLEAN $783 $1,275 Not Implemented
TN0406 # 07 Y:1990 07 1990 KEEP LAMPS AND REFLECTORS CLEAN $461 $1,124 Not Implemented
TN0406 # 08 Y:1990 08 1990 TURN OFF EQUIPMENT WHEN NOT IN USE $721 $1,320 Not Implemented
TN0406 # 09 Y:1990 09 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $769 $653 Not Implemented
TN0406 # 10 Y:1990 10 1990 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $264 $335 Not Implemented
TN0406 # 11 Y:1990 11 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $240 $120 Not Implemented
TN0406 # 01 Y:1990 01 1990 REDESIGN PROCESS $5,552 $21,192 Not Implemented
MA0191 # 01 Y:1990 01 1990 REPAIR OR REPLACE STEAM TRAPS $1,017 $1,992 Not Implemented
MA0191 # 05 Y:1990 05 1990 AIR CONDITION ONLY SPACE NECESSARY $7,339 $3,720 Implemented
MA0191 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,066 $4,648 Not Implemented
MA0191 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,162 $476 Implemented
MA0191 # 02 Y:1990 02 1990 OPTIMIZE PLANT POWER FACTOR $4,754 $9,230 Not Implemented
RU0093 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,497 $183 Implemented
RU0093 # 02 Y:1990 02 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $651 $0 Not Implemented
RU0093 # 03 Y:1990 03 1990 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,109 $1,900 Not Implemented
RU0093 # 04 Y:1990 04 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,811 $2,500 Implemented
RU0093 # 05 Y:1990 05 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,019 $0 Not Implemented
RU0093 # 06 Y:1990 06 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $227 $550 Not Implemented
RU0093 # 07 Y:1990 07 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $5,411 $1,920 Not Implemented