IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

69

matching recommendations
Reset
SIC 355 Special Industry Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0197 # 06 Y:2000 06 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,153 $120 Not Implemented
AR0197 # 08 Y:2000 08 2000 MAINTAIN/ENLARGE A STOCK OF SPARE PARTS $80,371 $16,150 Not Implemented
AR0197 # 02 Y:2000 02 2000 DISCONNECT BALLASTS $6,341 $2,605 Not Implemented
AR0197 # 04 Y:2000 04 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $101 $1,780 Not Implemented
AR0197 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,334 $6,713 Not Implemented
AR0197 # 07 Y:2000 07 2000 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $7,335 $500 Not Implemented
AR0197 # 01 Y:2000 01 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,457 $2,178 Not Implemented
AR0197 # 03 Y:2000 03 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $26 $0 Not Implemented
UF0260 # 12 Y:2000 12 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $741 $520 Implemented
UF0260 # 07 Y:2000 07 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $833 $590 Implemented
UF0260 # 06 Y:2000 06 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $511 $0 Implemented
UF0260 # 05 Y:2000 05 2000 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $7,535 $9,667 Not Implemented
UF0260 # 04 Y:2000 04 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,910 $647 Implemented
UF0260 # 03 Y:2000 03 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,321 $50 Implemented
UF0260 # 02 Y:2000 02 2000 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $17,512 $21,931 Not Implemented
UF0260 # 08 Y:2000 08 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,994 $4,990 Implemented
UF0260 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,696 $10,710 Implemented
UF0260 # 09 Y:2000 09 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,487 $13,000 Implemented
UF0260 # 10 Y:2000 10 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $2,000 $0 Implemented
UF0260 # 11 Y:2000 11 2000 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $58,300 $87,900 Not Implemented
MA0469 # 07 Y:2000 07 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $497 $750 Implemented
MA0469 # 04 Y:2000 04 2000 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,400 $12,780 Implemented
MA0469 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,374 $1,010 Implemented
MA0469 # 02 Y:2000 02 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,357 $0 Implemented
MA0469 # 01 Y:2000 01 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,392 $17,000 Not Implemented