IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

369

matching recommendations
Reset
SIC 3556 Food Products Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0302 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $18,237 $12,000 Not Implemented
LE0302 # 06 Y:2010 06 2010 REPAIR OR REPLACE STEAM TRAPS $46,342 $10,000 Implemented
LE0302 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,786 $1,720 Implemented
LE0302 # 04 Y:2010 04 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,289 $6,000 Not Implemented
LE0302 # 02 Y:2010 02 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $43,590 $6,000 Not Implemented
LE0302 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $100,844 $52,100 Not Implemented
CO0634 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,990 $920 Implemented
CO0634 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,550 $1,000 Implemented
CO0634 # 03 Y:2010 03 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,100 $7,610 Not Implemented
CO0634 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,550 $41,810 Implemented
CO0634 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,720 $6,380 Not Implemented
CO0634 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,630 $2,690 Not Implemented
CO0634 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,630 $16,780 Not Implemented
CO0634 # 08 Y:2010 08 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,380 $14,690 Not Implemented
CO0634 # 09 Y:2010 09 2010 INSTALL OCCUPANCY SENSORS $1,460 $3,000 Not Implemented
CO0634 # 10 Y:2010 10 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $170 $590 Not Implemented
OR0543 # 13 Y:2008 13 2008 UPGRADE CONTROLS ON COMPRESSORS $7,300 $5,700 Implemented
OR0543 # 12 Y:2008 12 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $46,700 $46,700 Implemented
OR0543 # 11 Y:2008 11 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $52,540 $2,200 Implemented
OR0543 # 10 Y:2008 10 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,500 $43,600 Implemented
OR0543 # 09 Y:2008 09 2008 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $78,900 $132,800 Implemented
OR0543 # 08 Y:2008 08 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,510 $0 Implemented
OR0543 # 07 Y:2008 07 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $42,310 $148,560 Implemented
OR0543 # 06 Y:2008 06 2008 OPTIMIZE PLANT POWER FACTOR $10,290 $54,000 Implemented
OR0543 # 05 Y:2008 05 2008 INSTALL OCCUPANCY SENSORS $19,521 $31,119 Implemented