IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

760

matching recommendations
Reset
SIC 3559 Special Industry Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0380 # 08 Y:2010 08 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,714 $1,500 Not Implemented
UM0380 # 09 Y:2010 09 2010 PREHEAT COMBUSTION AIR WITH WASTE HEAT $273 $1,400 Not Implemented
WV0414 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $22,889 $18,300 Not Implemented
WV0414 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,304 $42,420 Implemented
WV0414 # 03 Y:2010 03 2010 REDUCE FLUID FLOW RATES $7,185 $280 Implemented
WV0414 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,064 $15,400 Not Implemented
WV0414 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $3,414 $400 Not Implemented
WV0414 # 06 Y:2010 06 2010 USE RADIANT HEATER FOR SPOT HEATING $3,403 $5,310 Not Implemented
WV0414 # 07 Y:2010 07 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,505 $14,000 Not Implemented
WV0414 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,467 $3,614 Implemented
WV0414 # 09 Y:2010 09 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,409 $835 Not Implemented
WV0414 # 10 Y:2010 10 2010 RECOVER MECHANICAL ENERGY $1,362 $1,000 Implemented
WV0414 # 11 Y:2010 11 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,335 $1,070 Implemented
WV0414 # 12 Y:2010 12 2010 DEVELOP A REPAIR/REPLACE POLICY $1,318 $740 Implemented
WV0414 # 13 Y:2010 13 2010 IMPROVE LUBRICATION PRACTICES $413 $465 Not Implemented
WV0414 # 14 Y:2010 14 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $388 $1,735 Implemented
WV0385 # 01 Y:2008 01 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $40,090 $4,000 Not Implemented
WV0385 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,198 $81,425 Implemented
WV0385 # 03 Y:2008 03 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,879 $21,600 Not Implemented
WV0385 # 04 Y:2008 04 2008 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $14,783 $5,000 Not Implemented
WV0385 # 05 Y:2008 05 2008 STANDARDIZE MOTOR INVENTORY $6,638 $763 Implemented
WV0385 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,599 $548 Implemented
WV0385 # 07 Y:2008 07 2008 INSULATE BARE EQUIPMENT $3,100 $140 Implemented
WV0385 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,980 $0 Implemented
WV0385 # 09 Y:2008 09 2008 IMPROVE LUBRICATION PRACTICES $2,864 $2,950 Not Implemented