Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
760
matching recommendationsSIC | 3559 | Special Industry Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0534 # 05 Y:2003 | 05 | 2003 | INSTALL OCCUPANCY SENSORS | $1,520 | $1,070 | Not Implemented |
CO0534 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,171 | $656 | Not Implemented |
CO0534 # 07 Y:2003 | 07 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $980 | $2,750 | Not Implemented |
CO0534 # 08 Y:2003 | 08 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $710 | $620 | Not Implemented |
NC0262 # 01 Y:2003 | 01 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,471 | $10,000 | Not Implemented |
NC0262 # 02 Y:2003 | 02 | 2003 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $33,773 | $55,000 | Not Implemented |
NC0262 # 03 Y:2003 | 03 | 2003 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $4,320 | $5,653 | Not Implemented |
NC0262 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,339 | $50 | Not Implemented |
NC0262 # 05 Y:2003 | 05 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,272 | $5,225 | Not Implemented |
NC0262 # 06 Y:2003 | 06 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,284 | $800 | Not Implemented |
LE0138 # 01 Y:2002 | 01 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $311 | $500 | Not Implemented |
LE0138 # 02 Y:2002 | 02 | 2002 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $27,336 | $6,800 | Not Implemented |
LE0138 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $897 | $147 | Not Implemented |
LE0138 # 04 Y:2002 | 04 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $670 | $0 | Implemented |
LE0138 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $563 | $0 | Not Implemented |
LE0138 # 06 Y:2002 | 06 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,471 | $100 | Implemented |
LE0138 # 07 Y:2002 | 07 | 2002 | USE OPTIMUM THICKNESS INSULATION | $1,551 | $60 | Implemented |
SF0239 # 01 Y:2002 | 01 | 2002 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,912 | $0 | Not Implemented |
SF0239 # 02 Y:2002 | 02 | 2002 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $8,588 | $460 | Not Implemented |
SF0239 # 03 Y:2002 | 03 | 2002 | REDUCE FLUID FLOW RATES | $34,956 | $25,339 | Not Implemented |
SF0239 # 04 Y:2002 | 04 | 2002 | INSTALL OCCUPANCY SENSORS | $324 | $480 | Not Implemented |
SF0239 # 05 Y:2002 | 05 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,127 | $33,923 | Not Implemented |
SF0239 # 06 Y:2002 | 06 | 2002 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $20,800 | $0 | Not Implemented |
OK0636 # 01 Y:2002 | 01 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,565 | $16,300 | Implemented |
OK0636 # 02 Y:2002 | 02 | 2002 | COVER OPEN TANKS | $2,412 | $528 | Not Implemented |