IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

760

matching recommendations
Reset
SIC 3559 Special Industry Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0330 # 10 Y:1998 10 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,000 $5,000 Not Implemented
WI0330 # 11 Y:1998 11 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $918 $640 Implemented
WI0330 # 12 Y:1998 12 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $873 $3,000 Not Implemented
WI0330 # 13 Y:1998 13 1998 RECOVER WASTE HEAT FROM EQUIPMENT $503 $500 Not Implemented
SD0205 # 01 Y:1998 01 1998 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $11,008 $12,000 Not Implemented
SD0205 # 02 Y:1998 02 1998 INSTALL TIMERS AND/OR THERMOSTATS $1,896 $1,029 Not Implemented
SD0205 # 03 Y:1998 03 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,819 $620 Not Implemented
SD0205 # 04 Y:1998 04 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,039 $195 Implemented
SD0205 # 05 Y:1998 05 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $727 $0 Implemented
SD0205 # 06 Y:1998 06 1998 RECYCLE WHITE WATER $180,189 $400,000 Implemented
SD0205 # 07 Y:1998 07 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $336,172 $311,000 Not Implemented
SD0205 # 08 Y:1998 08 1998 MOVE PRODUCT USING MECHANICAL MEANS $19,800 $8,000 Not Implemented
SD0205 # 09 Y:1998 09 1998 MOVE PRODUCT USING MECHANICAL MEANS $14,850 $1,200 Not Implemented
SD0205 # 10 Y:1998 10 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $24,243 $3,300 Not Implemented
CO0418 # 01 Y:1998 01 1998 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,020 $2,000 Implemented
CO0418 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,800 $700 Implemented
CO0418 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $640 $330 Implemented
CO0418 # 04 Y:1998 04 1998 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $7,100 $0 Not Implemented
CO0418 # 05 Y:1998 05 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $7,130 $500 Not Implemented
CO0418 # 06 Y:1998 06 1998 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $210 $0 Not Implemented
CO0418 # 07 Y:1998 07 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $10,560 $4,510 Implemented
UL0188 # 01 Y:1997 01 1997 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $566 $1,100 Implemented
UL0188 # 02 Y:1997 02 1997 WASH AND REUSE RAGS ON-SITE $1,313 $1,640 Not Implemented
UL0188 # 03 Y:1997 03 1997 USE ABSORPTION, EXTRACTION TO REMOVE CONTAMINANTS $2,103 $36 Not Implemented
UL0188 # 04 Y:1997 04 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,408 $17,500 Not Implemented