Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75

matching recommendations
Reset
SIC 3559 Special Industry Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0232 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $1,165 $225 Not Implemented
SU0232 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,647 $583 Implemented
SU0232 # 08 Y:2006 08 2006 KEEP BOILER TUBES CLEAN $2,880 $1,534 Implemented
SU0232 # 10 Y:2006 10 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,585 $9,380 Not Implemented
SU0232 # 11 Y:2006 11 2006 REDUCE VENTILATION AIR $12,512 $26,994 Not Implemented
SU0232 # 12 Y:2006 12 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,616 $11,554 Not Implemented
SU0232 # 13 Y:2006 13 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $517 $1,545 Not Implemented
SU0232 # 14 Y:2006 14 2006 INSTALL OCCUPANCY SENSORS $651 $2,039 Not Implemented
SU0232 # 15 Y:2006 15 2006 OPTIMIZE PLANT POWER FACTOR $1,024 $9,635 Not Implemented
SU0232 # 09 Y:2006 09 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,307 $1,182 Not Implemented
SU0194 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $2,404 $868 Implemented
SU0194 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $662 $0 Implemented
SU0194 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $734 $11 Implemented
SU0194 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,623 $1,616 Implemented
SU0194 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,484 $576 Implemented
SU0194 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $136 $154 Implemented
SU0194 # 07 Y:2004 07 2004 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $1,122 $2,975 Not Implemented
SU0123 # 01 Y:2001 01 2001 ELIMINATE SHIFT $13,517 $0 Not Implemented
SU0123 # 08 Y:2001 08 2001 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $42 $3 Implemented
SU0123 # 07 Y:2001 07 2001 INSULATE BARE EQUIPMENT $347 $117 Implemented
SU0123 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $378 $196 Implemented
SU0123 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $739 $0 Implemented
SU0123 # 04 Y:2001 04 2001 CHECK FOR ACCURACY OF UTILITY / POWER METERS $1,800 $0 Implemented
SU0123 # 03 Y:2001 03 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,325 $7,060 Implemented
SU0123 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $2,968 $694 Implemented