IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0577 # 02 Y:2022 02 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,407 $2,618 Implemented
UF0577 # 03 Y:2022 03 2022 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,363 $0 Implemented
UF0577 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,991 $304 Implemented
UF0577 # 06 Y:2022 06 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,972 $0 Implemented
UF0577 # 09 Y:2022 09 2022 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,049 $200 Implemented
UF0577 # 10 Y:2022 10 2022 SCHEDULE DELIVERIES ACCORDING TO DEMAND $3,120 $2,528 Implemented
UF0577 # 11 Y:2022 11 2022 RECOVER AND REUSE WASTE MATERIAL $28,657 $31,000 Implemented
UF0577 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,354 $640 Implemented
UF0562 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $2,645 $4,780 Implemented
UF0562 # 08 Y:2020 08 2020 USE PHOTOCELL CONTROLS $904 $0 Implemented
UF0562 # 06 Y:2020 06 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,545 $1,778 Implemented
UF0562 # 03 Y:2020 03 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,271 $0 Implemented
UF0562 # 02 Y:2020 02 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,635 $4,086 Implemented
MI0347 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,740 $2,923 Implemented
MI0347 # 04 Y:2019 04 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $5,404 $3,100 Implemented
MI0347 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,870 $12,067 Implemented
MI0347 # 08 Y:2019 08 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,489 $5,529 Implemented
MI0347 # 11 Y:2019 11 2019 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,617 $1,707 Implemented
MI0347 # 12 Y:2019 12 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $547 $480 Implemented
GT0915 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,057 $13,064 Implemented
GT0915 # 02 Y:2018 02 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,909 $580 Implemented
GT0915 # 01 Y:2018 01 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,293 $100 Implemented
UF0207 # 01 Y:1998 01 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,410 $0 Implemented
UF0207 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,914 $1,700 Implemented
UF0207 # 06 Y:1998 06 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,587 $0 Implemented