IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,252

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0246 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN WATER LINES AND VALVES $3,527 $1,200 Not Implemented
IC0246 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,840 $544 Not Implemented
UF0562 # 06 Y:2020 06 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,545 $1,778 Implemented
UF0562 # 07 Y:2020 07 2020 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,484 $2,380 Not Implemented
UF0562 # 08 Y:2020 08 2020 USE PHOTOCELL CONTROLS $904 $0 Implemented
UF0562 # 01 Y:2020 01 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $30,571 $24,600 Not Implemented
UF0562 # 02 Y:2020 02 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,635 $4,086 Implemented
UF0562 # 03 Y:2020 03 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,271 $0 Implemented
UF0562 # 04 Y:2020 04 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,128 $7,733 Not Implemented
UF0562 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $2,645 $4,780 Implemented
WV0604 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,454 $75,747 Not Implemented
WV0604 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $20,602 $23,284 Implemented
WV0604 # 03 Y:2021 03 2021 INSULATE BARE EQUIPMENT $18,040 $7,122 Implemented
WV0604 # 04 Y:2021 04 2021 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,330 $1,500 Implemented
WV0604 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,431 $403 Implemented
WV0604 # 06 Y:2021 06 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,500 $1,792 Implemented
WV0604 # 07 Y:2021 07 2021 DEVELOP A REPAIR/REPLACE POLICY $1,749 $672 Implemented
WV0604 # 08 Y:2021 08 2021 UPGRADE CONTROLS ON COMPRESSORS $1,727 $6,630 Not Implemented
WV0604 # 09 Y:2021 09 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,302 $4,100 Implemented
WV0604 # 10 Y:2021 10 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $733 $35 Implemented
CL2015 # 01 Y:2020 01 2020 MODIFY STARTUP/SHUTDOWN TIMES $7,855 $550 Not Implemented
CL2015 # 02 Y:2020 02 2020 USE OPTIMUM TEMPERATURE $17,243 $0 Not Implemented
CL2015 # 03 Y:2020 03 2020 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $53 $0 Not Implemented
CL2015 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,229 $4,600 Not Implemented
SU0498 # 01 Y:2020 01 2020 REDUCE VENTILATION AIR $6,925 $882 Not Implemented